From 57f2fa45b210b594c51d2f09c7a8c5373b9de921 Mon Sep 17 00:00:00 2001 From: =?UTF-8?q?Leopoldo=20Rodr=C3=ADguez?= Date: Thu, 22 Oct 2026 13:59:32 -0600 Subject: [PATCH] hbox-docs: modo crisis --- CLAUDE.md | 18 +++++++++++++++++- hbox-docs | 2 +- 2 files changed, 18 insertions(+), 2 deletions(-) diff --git a/CLAUDE.md b/CLAUDE.md index 75d8f73..59d0821 100644 --- a/CLAUDE.md +++ b/CLAUDE.md @@ -354,7 +354,12 @@ primitive/XOR comparison, `netparse.py`, `copper.py` connectivity + Kelvin + cut `#elif defined(HBOX_BOARD_V56)` include in the .ino) · lote `2026-10-22_auditoria-final` (closes `t-v56-revision-gerber`, re-aims `t-v56-piloto` at today's 5 + 5 order with the checklist, `t-fw-070` in progress with F-1..F-8 sized, creates `t-p1-relleno-commit`, `d-22-1-go-piloto`, `t-preorden-108-322-bom`). 0.7.0 work list: F-1 0.7.0-pre 1 day · F-2 backup cycle 3–4 days · F-3 SC16IS752 1 day · -F-4 field Ethernet 2 days · F-5..F-8 2 days. +F-4 field Ethernet 2 days · F-5..F-8 2 days. **13:30 re-verification on Leo's 13:00 saves** (V5.6 `338ee14b`, V5.7 `85baca51`, packages +regenerated): saved fill = fresh project-aware refill (0.000 mm² both), package = file, copper and all 11 layers + drills identical to the +morning audit, BOM/CPL same SHA (D10 still SMBJ33A → condition 3 stays), DRC unchanged → **P-1 closed, verdict unchanged**, commit pending. +Only non-fill diff in the files = silkscreen text `render_cache` (cosmetic). Re-check tooling kept in `Auditoria-Final-V56-V57/scripts/`: +`verify_mac.sh` (kicad-cli DRC + as-saved Gerber + project-aware `refill.py` + Gerber) and `gcmp_b.py` (A saved-vs-fresh · B package-vs-file · +C/D vs the audited copper) — 5 min after any change, before paying; the quick wins run in a parallel session. **22-oct: T39 — v6 block A done by script (Leo, 09:40: "do the changes on V6, it's the priority").** `kicad/tools/t39_v6_bloque_a.py` (requires T38; drift-checks every part/track it touches; idempotent; `.T39bak`). Proposal α applied: D34 rot 90 at (181.08, 121.75), @@ -394,6 +399,17 @@ R53/R54 ≤ 3 mm from U6.18» (Michelle, 24-oct); comments on the v6 tasks. Test backend incl. a simulated 16-oct board. Site: Ruta/hitos/enfoque_inicial to pass 6 (V5.6 and V5.7 «Lista para Gerber», pilot ≈ 22-oct), Ingeniería decisions + Bitácora entries, «El sitio es el centro de mando» in the engineer's guide (v1.2), first rule on the home page. Vault: playbook + Drogheda memory set brought to 21-oct. +**Crisis mode (2026-10-22, 13:30; Leo).** Project traffic light **red**. Causes: no payment received this month → +operating tight, no significant purchases; TIMSA (Manzanillo) blocked by an administrative issue with our vehicle there; +EIT (Ensenada) waiting for material shipped from Manzanillo; ICAVE (Veracruz) bad weather → short field windows, with +faults that can only be investigated on site; software: a Wialon retranslator pointing to our server is missing (to +compare RTK vs the legacy GPS in our monitor) and sudden disconnections must be investigated immediately. Immediate goal: +**1–2 units installed per site**. Paying suppliers unblocks most tasks. Board: lote `2026-10-22_crisis` (cobranza, +priority purchase list, purchases/pre-orders/ferretería blocked on payment, per-site install tasks, TIMSA vehicle, EIT +material, ICAVE field investigation, Wialon retranslator, disconnections, field owner per site, periodic meetings). +Site: tasks get `sitios` (icave · timsa · eit · lzc · qro; unset = Querétaro) with a site filter, new track +**Gestión**, a home traffic light with per-site colors, and a **Juntas** page (standup + quick wins recorded with +Gemini → Claude writes a lote → Leo applies). Deploy needs `restart actas-hbox` **before** `tablero.sh aplicar`. --- diff --git a/hbox-docs b/hbox-docs index 8a58719..0e82851 160000 --- a/hbox-docs +++ b/hbox-docs @@ -1 +1 @@ -Subproject commit 8a58719901b642092dafd769e095b8edfc207cf0 +Subproject commit 0e828510a95d64e4aa81d372607c3fdbecd27ac4