1.1 Phase C5: MH1/MH3 deleted, first critical copper hand-routed
- MH1 and MH3 mounting holes removed per review (4-corner mounting via MH2/MH4/MH5/MH6 remains); Leo's placement pass B7 baselined first - 54 new F.Cu segments (20 verified hops): buck SW node U12-C100-L8-D11 at 0.8mm, SYS5V+FB+COMP chains, XI crystal loop (U11-Y1-C95), SER_XTAL1 (U10-Y2-C82), TXP tap R92-J10 legs, RX terminations R94/R95->C97, TCT island J10.4-C98-R92.2/R93.2 - Leo's 46 hand-routed 24V/IGN segments byte-preserved; 0 cross-net clearance violations (0.2mm), parens balanced - Remaining 16 congested hops (QFN fan-out, XO, RCT tail, 3V3_ETH trunks) deliberately left for Freerouting push-and-shove Co-Authored-By: Claude Fable 5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_01GSKKes8GsS4YHAMWJ44tCm
This commit is contained in:
parent
bdb2e3ab42
commit
aa7f5a674b