Commit Graph

3 Commits

Author SHA1 Message Date
61064fe76c 1.1 Phase B2: SimpleRTK2B module to the front-left edge per review
- J1/J2 socket pair translated -43.43mm: rows now x62.0-113.8, USB end
  (J1 pad20 /SYS5V) at the left board edge; 49 stale J1/J2 pad stubs ripped
- Ethernet corner rebuilt lower-left: RJ45 J10 on left edge y106-125 inside
  relocated MAGJACK_NO_POUR zone, W5500+25MHz+terminations below the serial
  stack, clear of the existing R5/R6/R7/D1/C5/C7 LED cluster
- ANT_CORRIDOR_KEEPOUT retired (antenna now exits at the module end itself)
- Rig1 nudged below Rigb1 (was inside J2's new courtyard band), stub ripped
- 3D models: 58 legacy KICAD6/KICAD7 3DMODEL_DIR refs repointed at
  KICAD10_3DMODEL_DIR so new parts render in the 3D viewer
- Verified: 190 footprints, 0 pairwise courtyard conflicts, parens balanced

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01GSKKes8GsS4YHAMWJ44tCm
2026-07-29 05:20:21 +00:00
0af0373def 1.1 Phase B: board grown to 155x100 (20mm left), placement for blocks M/N/O
- Outline left edge 80.19->60.19; MH5/MH6 mounting holes cloned to new corners
- Antenna corridor keepout front-left (notched around MH6) + magjack no-pour/no-via zone
- RJ45 J10 + RS-485 P15 + RS-232 P16 on new left edge behind antenna corridor
- W5500 U11 + 25MHz + terminations between jack and P5; 3V3_ETH buck U12/L8/D11
  in the freed P13/H3 gap under the module (low-profile), bulk caps at load
- SC16IS752 U10 serial cluster behind P15/P16; MAX3232 U15, SP3485 U14
- PCF8574 U13 clear of MOD1 pad ring; RGB JST P14 on right edge (freed P3 slot)
- H4 TTL header moved to front edge (was under module, on D5)
- 24V entry block relocated beside P1 (Q10/C10 in P12 lane, D10/DzG1/Rrp1 pocket);
  old cross-board 24V routing ripped for HV24 re-route
- P3/P13/H3 depopulated; J1/J2/DB pad nets updated (ETH SPI, SER_IRQ, LED flip)
- Fix Phase A miss: SC16IS752 pins 13/14 (I2C SCL/SDA) now wired in sch + board
- Placement verified: 190 footprints, 0 courtyard conflicts, 0 corridor intrusions,
  all new nets 2-ended (verify_phase_b.py)

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01GSKKes8GsS4YHAMWJ44tCm
2026-07-29 04:39:35 +00:00
ca96c94ad6 HBOX v4: project renamed hbox-watchdog-v4 (199 sch + 113 pcb refs); v3-PROD files restored to as-fabricated as the frozen EinarBoard 1.0 record; ERC endpoint_off_grid muted on v4
v4 = the live 1.1/Phase-A design (J1 renumbered, blocks M/N/O, HV24, PFI 4.40V). v3-PROD trio = exact as-fabbed state from 9892279 (mirrored J1 as the bench/fleet boards physically are) - do not edit. dru/prl carried to v4. Off-grid warning backlog stays visible-but-muted; real geometry sweep slated for Phase D.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01GSKKes8GsS4YHAMWJ44tCm
2026-07-29 03:34:46 +00:00