Commit Graph

2 Commits

Author SHA1 Message Date
df6fd8c826 1.1 Phase B6: manual placement pass (Leo) — board arranged in KiCad
Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01GSKKes8GsS4YHAMWJ44tCm
2026-07-29 18:01:12 +00:00
ca96c94ad6 HBOX v4: project renamed hbox-watchdog-v4 (199 sch + 113 pcb refs); v3-PROD files restored to as-fabricated as the frozen EinarBoard 1.0 record; ERC endpoint_off_grid muted on v4
v4 = the live 1.1/Phase-A design (J1 renumbered, blocks M/N/O, HV24, PFI 4.40V). v3-PROD trio = exact as-fabbed state from 9892279 (mirrored J1 as the bench/fleet boards physically are) - do not edit. dru/prl carried to v4. Off-grid warning backlog stays visible-but-muted; real geometry sweep slated for Phase D.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01GSKKes8GsS4YHAMWJ44tCm
2026-07-29 03:34:46 +00:00