Leopoldo Rodríguez f2232e9e4e 1.1 Phase C11: clear all DRC findings on EinarBoard 2.0 (v4)
Static-DRC battery (true pad geometry: circle/oval/roundrect/rect, NPTH as
hole-only) over 693 pads / 351 vias / 1982 segments -> 0 violations at the
project rule of 0.15mm min clearance, 0.25mm hole-to-hole.

Fixed:
 [1] hole-to-hole -0.300  duplicate GND stitching via coincident at
     (94.79,60.30) -- JLCPCB would have drilled the same hole twice. Removed.
 [2] U11.13 (NC)  +0.100  GND pad14 stub zigzag -> one straight lane x93.01
 [3] U13.3 (GND)  +0.130  I2C_SCL y=87.6 excursion -> single lane y=87.5277;
     the GND stitcher the zigzag was dodging moved 0.138 north onto U13.2
     pad copper (same uuid/net, still bonded to its track)
 [4] ETH_LINKLED  +0.130  3V3_ETH under-body via/rung -> y=57.455, the exact
     centre of the only legal B.Cu window (RSET@56.89 / LINKLED@58.07);
     165000nm both ways
 [5] U11.17        +0.140  GND pad16 lane x94.14/94.15 -> single lane x94.10
 [6][7] U11.46/47  +0.150  ETH_PMODE north lane y=49.31 -> 49.24
 [8] stranded 1.5x1.5mm rule area (tracks/vias/pour not_allowed) nested in
     U3's footprint but stranded ~22mm east of it with zero copper within
     3mm -- a phantom no-route trap. Removed.
 [9] stranded /3V3_ETH web on In2.Cu (the GND inner plane): orphaned remains
     of the pad17 via removed in C10e, connected to nothing, punching a
     clearance void in the GND plane. Removed.

Verified: paren balance 0; 188/188 footprints intact (only U3 shrinks, by the
nested rule area); top-level block census unchanged but segment 1992->1982 and
via 352->351; every touched net resolves to exactly ONE copper island
(/3V3_ETH went 2 -> 1); 24V-class hand-routed copper byte-identical
(24V 23 segs, /24V_IN 12 segs, IGN_IN 10 segs).

Pre-C11 board preserved at .mcp-backups/hbox-watchdog-v4.kicad_pcb.pre-C11

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01GSKKes8GsS4YHAMWJ44tCm
2026-07-31 23:22:16 +00:00
_brand Initial commit (Hub backfill) 2026-06-21 23:39:49 -06:00
.claude/skills/project-drogheda Initial commit (Hub backfill) 2026-06-21 23:39:49 -06:00
00-Project-Management auto-sync 2026-07-10 18:00 2026-07-10 18:00:15 -06:00
01-Requirements Initial commit (Hub backfill) 2026-06-21 23:39:49 -06:00
02-Architecture-Software auto-sync 2026-06-22 18:00 2026-06-22 18:00:16 -06:00
03-Architecture-Hardware 1.1 Phase C11: clear all DRC findings on EinarBoard 2.0 (v4) 2026-07-31 23:22:16 +00:00
04-Source-Code Bump firmware submodule to v3.0 (36d8ff4) 2026-07-29 03:49:47 +00:00
05-Analytics-Reports auto-sync 2026-06-22 18:00 2026-06-22 18:00:16 -06:00
06-Testing-Validation sync: commit before registering as submodule 2026-07-08 14:58:40 -06:00
99-Archive auto-sync 2026-07-09 18:00 2026-07-09 18:00:14 -06:00
Marketing auto-sync 2026-07-10 18:00 2026-07-10 18:00:15 -06:00
mcpmarket-me auto-sync 2026-07-04 18:00 2026-07-04 18:00:09 -06:00
scripts auto-sync 2026-07-07 18:00 2026-07-07 18:00:12 -06:00
.gitignore 2026-07-02: PROD schematic complete (ERC 0) + carrier-board PCB + doc sweep to the Jul-2 ledger 2026-07-02 22:18:56 -06:00
.gitmodules Wire firmware/htracker/log-analysis as proper submodules 2026-06-22 00:03:31 -06:00
CLAUDE.md auto-sync 2026-07-20 18:00 2026-07-20 18:00:14 -06:00
mcpmarket-plugin-me.zip auto-sync 2026-07-04 18:00 2026-07-04 18:00:09 -06:00
README.md 2026-07-02: PROD schematic complete (ERC 0) + carrier-board PCB + doc sweep to the Jul-2 ledger 2026-07-02 22:18:56 -06:00

Project Drogheda (GPS RTK)

Helgen Technologies' HBOX RTK GPS tracker fleet for Hutchison Ports heavy equipment (ICAVE / TIMSA / EIT / LCT) — centimetre-class position over 4G, streamed to the Helgen backend (retranslator → Wialon/Traccar → VERONICA), built to survive a hot, salty, high-vibration port environment.

New here? Read 00-Project-Management/Engineering-Handover.md first. It is the deep context: product, failure analysis, fixes, repo map, open items, glossary. This README is the 2-minute orientation; CLAUDE.md is the terse machine index.


Where we are (2026-06-20 · updated 2026-07-02)

2026-07-02: backend deployed + stable; thermal chamber run done; 3-board protoboard campaign in flight (units to ICAVE 7-jul). Watchdog v3 PROD schematic is complete (ERC 0) — LTC4040 battery-backup sized to the 12 Ah pack, fail-safe Modo-B relay bypass — and the PCB is now a 120×100 carrier board: Blackpill + simpleRTK2B Pro (UNO-shield sockets) + 4G NTRIP Master (on-board XBee socket) all on female headers. Layout in placement review; fab gate = proto bench validation. Canonical: 03-Architecture-Hardware/watchdog-electrical-design-state.md.

We deployed a first batch of HBOX trackers on ICAVE machines in Veracruz. They worked "ish," then failed. We are mid-crisis, hardening for scale — target 30 units by August. The failure is three independent fronts, fixed in parallel:

  1. Backend (confirmed in code) — retranslator.py head-of-line blocks the whole fleet on slow upstream, and an anti-jump filter can permanently black-hole a healthy unit.
  2. Thermal — an ASA case (UV-stable, ~95–100 °C — adequate) sealed in a sealed IP67 cabinet that also holds the heat-generating Mean Well PSU, in full sun → nested heat trap for the battery / boost / modem (not the case).
  3. Prototype hardware — Dupont + hand-wiring + 18650/PowerBoost; fragile under vibration.

Units: all pulled — 4 in hand (3 dead, 1 working-ish) in Veracruz; team in Querétaro → remote debug. Field firmware is v1 (no thermal log).

Free triage: a unit ONLINE in htracker but OFFLINE in Wialon is a backend victim, not dead hardware. Check that before condemning a radio.


The product in one breath

Rover (HBOX) on the machine + Base Station (Ardusimple AS-PRO-CORS, 110/230 V) publishing RTCM3 corrections over NTRIP. The rover gets corrections over the 4G modem, not the GNSS → recover a dead link by power-cycling the 4G stack, never a GNSS reset. HBOX core: simpleRTK2B Pro (ZED-F9P) · 4G NTRIP Master · STM32F411 watchdog · Mean Well SD-15B-05 (24→5 V) · PowerBoost + 18650 · GX16-5 to the cabinet. 24 V is the production variant.

Invariants (never violate)

  1. Power-off is the safe state. 2. Never vanish, never loop. 3. Corrections ride the 4G modem, not the GNSS. 4. No material that softens below ~80 °C (PLA-class) in the thermal path — the ASA enclosure complies; design to measured cabinet temperature. 5. Backend forwards without head-of-line blocking; anti-jump never locks out a healthy unit. 6. No secrets in the repo (the committed MSSQL password is a live violation to rotate).

Repo layout

00-Project-Management (plan, ethos, financials, handover, Drive tooling) · 01-Requirements (SRS, product spec, tracker) · 02-Architecture-Software (backend review) · 03-Architecture-Hardware (cabinet/HBOX, BOM, PCB brief, watchdog, manual) · 04-Source-Code (firmware/ · htracker/ · notifications/) · 05-Analytics-Reports (SQL views — placeholder) · 06-Testing-Validation (RCA, diagnostics) · Marketing (datasheet, brochure) · _brand (LaTeX style) · 99-Archive (raw inputs).

Quick start

# Branded docs (XeLaTeX; League Spartan + MADE Evolve Sans):
cd 01-Requirements/HBOX-Ficha-Tecnica && latexmk -xelatex main.tex

# Firmware (own repo 'hbox-firmware', at 04-Source-Code/firmware):
#   open blackpillrtkcode_v2/blackpillrtkcode_v2.ino in the STM32duino toolchain.
#   ⚠ Bench-test before any field flash — the sandbox cannot build STM32.

# Backend: 04-Source-Code/htracker  (ssh://git.helgen.dev:6611/htracker, feature/test500unidades)

Storage model (one home per artifact)

This repo = working source of truth (editable .md/.tex, code). Google Drive Drogheda (GPS RTK) = finalized exports (branded PDFs, native Docs/Sheets). Second Brain vault = distilled decisions/lessons. Author in repo → export final to Drive → distill to vault. Drive upload how-to + mapping: 00-Project-Management/Drive-Upload/README.md. Never change Drive sharing — that's Leo's call.

Go deeper