hbox-docs: acuerdos de la junta del 22-oct; CLAUDE.md §0

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_016X4CAujMuib2tDqt9JRg6X
This commit is contained in:
Leopoldo Rodríguez 2026-10-22 16:34:53 -06:00
parent ac74971e11
commit 571ef021c9
2 changed files with 12 additions and 1 deletions

View File

@ -437,6 +437,17 @@ without a fault (`DIAS_OPERACION`); a unit belongs to the site of its most recen
the vehicle number, type and 12/24 V. Home per-site counts read the same endpoint (old count until the restart); site
goal reads «1–2 unidades instaladas y probadas». Lote `2026-10-22_instalaciones` points each site's install task at both
actas. Crisis lote applied by Leo at 14:00; this deploy again needs `restart actas-hbox` before `tablero.sh aplicar`.
**Installation meeting (2026-10-22, 14:00; agreements confirmed by Leo at 16:13).** Gemini recorded it in English, so
what was said in Spanish was lost; Spanish notes in Leo's Drive (Google Meet → the meeting's folder) and the Juntas page now
says to set the meeting language to Spanish before starting. Agreed: field owners ICAVE **Alán**, EIT **Miguel**, LCT
**Antonio**, TIMSA **Jesús Honorato** (field technician and lead in Manzanillo); installation leads **Alán and Daniel**. Two Jesús: the
site user `jesus` is **Jesús Romero**, the installation technician (his actas are signed that way); Miguel, Antonio and
Honorato have no site account yet (`t-alta-responsables-campo`). **D-22-1 decided: GO to the 5 + 5 pilot, but the order waits until the
board's quick wins are done** (`t-v56-piloto` blocked by them; the pilot's order and bench hitos are now dateless). Daily
15-min standup + weekly quick-wins / traffic-light review. LCT is handled separately: the material should be there; only
the ironwork of the RTG brackets is missing (`t-lct-herreria`). Gibran opened the Wialon retranslator task during the meeting
(`T261022-5b37`, Gibran + Jacobo, 26-oct); `t-wialon-retranslator` closed as its duplicate. Lote
`2026-10-22_junta-instalacion`; `proyecto.json` sites carry `responsable`, shown on the home page.
**FOTA over 4G — feasibility per board (2026-10-22, 16:30; Leo: «what's needed, is it feasible on every board?»).** Yes on
**V5.6/V5.7 with no copper change**: downlink = `PIN_RTCM_TAP` PC7 (USART6_RX ← R111 ← DOUT_4G, 115200), so Helgen's caster
can interleave proprietary RTCM 3 frames (4001–4095) carrying signed image chunks that the F9P drops and the MCU collects;

@ -1 +1 @@
Subproject commit 0e499476fd7dbf8c26e1e9433b2a850a5b88cc9f
Subproject commit e1681a869306b79349e1ad02d078687b0f90aafa