Block O (modem): U19 A7670SA-LASC (C18548276, LGA-124) - 19 signal nets + 39 GND + 66 NC, all 124 pads accounted for. UART via 1.8V-side nets (_M suffix); USB joins J9 directly (VBUS A4/A9/B4/B9 + DP/DM); USB_BOOT -> TP8; VDD_EXT -> 1V8_MODEM (shifter reference only); NETLIGHT (1.8V) -> R109 4.7k -> Q22 MMBT3904 low-side, reusing the existing Rmled1+D4G1 LED string re-driven: MODEM_LED label -> 3V3, D4G1 cathode GND label -> MODEM_LED_K. Block P (3.8V rail): 24V -> D20 SS34 || MAIN5V -> D21 PMEG3050EP (C50603) -> VIN_MODEM -> U20 AP64350SP-13 (C2071691, 40V/3.5A) -> L20 4.7uH -> VBAT_MODEM. Values from datasheet DS41976: FB 0.8V (R110 75k / R111 20k = 3.8V), RT R117 200k = 500kHz (pin must not float), COMP R116 14k + C141 3.3nF + C142 47pF, BST C129 100nF, EP -> GND. EN = MODEM_PWR_EN (PC10) with R113 100k pull-down: rail DEFAULTS OFF (invariant #1); EN low >= 2s = HARD_CYCLE (invariant #3). Bulk: 2x 220uF/10V (C2827940) + 22uF/1uF/100nF/33pF/10pF + R112 1k bleed + D22 SMAJ5.0A TVS (C113952). VERIFY at layout: D22 pad-1-is-cathode against the fp marker. Block Q (SIM): U22 MFF2_SIM symbol (new in Drogheda-sym; FOOTPRINT TBD "Drogheda:MFF2_5x6_TBD" - build from the chosen carrier chip datasheet; PCB sync will flag it, expected). SIM_VDD 100nF + PESD5V0S1BA on DATA/CLK/RST (D23-25, C2827694, orientation cloned from D14). Block R (level shift): 2x 74LVC2T45DC (C730237, direction-fixed). U23 DIR=GND: 3V3 DIN_4G -> 1.8V DIN_4G_M. U24 DIR=1V8: DOUT_4G_M -> DOUT_4G (also feeds U18 RXD2) and MODEM_STATUS_M -> MODEM_STATUS (PC9). R106 100R taps DOUT_4G -> USART6_RX (PC7). DNP 0R bypasses R107/R108 across the RTCM path. Q20/Q21 2N7002 open-drain on PWRKEY/RESET with 100k pull-downs - MCU absent leaves the modem free (invariant #1). PWRKEY timing: SIMCom >=50ms on / >=2.5s off. CORRECTIONS this pass: (1) the schematic has 382 WIRE SEGMENTS - the earlier "zero wires" finding was a regex artifact (multi-line xy); label-on-pin work was unaffected (all verified against the PCB), but the LED relabel needed a wire-graph trace, now in the script. (2) 9 stale no_connect markers removed from MCU pins that now carry labels (PC1-PC3, PA7, PC8-PC12). (3) A7670SA is a 124-pad LGA, not the 88 claimed in the modem survey. NEXT: Leo runs ERC + Update PCB from Schematic (U22 will complain - footprint TBD, skip it), then T5 = LTC4040 input-limit errata fix + U7/L7 disposition, T6 = RF Block S + netclasses. Co-Authored-By: Claude Fable 5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_01YJ4eAB6zjQT49RVwpgfKdt |
||
|---|---|---|
| _brand | ||
| .claude/skills/project-drogheda | ||
| 00-Project-Management | ||
| 01-Requirements | ||
| 02-Architecture-Software | ||
| 03-Architecture-Hardware | ||
| 04-Source-Code | ||
| 05-Analytics-Reports | ||
| 06-Testing-Validation | ||
| 99-Archive | ||
| Marketing | ||
| mcpmarket-me | ||
| scripts | ||
| .gitignore | ||
| .gitmodules | ||
| CLAUDE.md | ||
| mcpmarket-plugin-me.zip | ||
| README.md | ||
Project Drogheda (GPS RTK)
Helgen Technologies' HBOX RTK GPS tracker fleet for Hutchison Ports heavy
equipment (ICAVE / TIMSA / EIT / LCT) — centimetre-class position over 4G, streamed to the
Helgen backend (retranslator → Wialon/Traccar → VERONICA), built to survive a hot, salty,
high-vibration port environment.
New here? Read
00-Project-Management/Engineering-Handover.mdfirst. It is the deep context: product, failure analysis, fixes, repo map, open items, glossary. This README is the 2-minute orientation;CLAUDE.mdis the terse machine index.
Where we are (2026-06-20 · updated 2026-07-02)
2026-07-02: backend deployed + stable; thermal chamber run done; 3-board protoboard campaign in flight (units to ICAVE 7-jul). Watchdog v3 PROD schematic is complete (ERC 0) — LTC4040 battery-backup sized to the 12 Ah pack, fail-safe Modo-B relay bypass — and the PCB is now a 120×100 carrier board: Blackpill + simpleRTK2B Pro (UNO-shield sockets) + 4G NTRIP Master (on-board XBee socket) all on female headers. Layout in placement review; fab gate = proto bench validation. Canonical:
03-Architecture-Hardware/watchdog-electrical-design-state.md.
We deployed a first batch of HBOX trackers on ICAVE machines in Veracruz. They worked "ish," then failed. We are mid-crisis, hardening for scale — target 30 units by August. The failure is three independent fronts, fixed in parallel:
- Backend (confirmed in code) —
retranslator.pyhead-of-line blocks the whole fleet on slow upstream, and an anti-jump filter can permanently black-hole a healthy unit. - Thermal — an ASA case (UV-stable, ~95–100 °C — adequate) sealed in a sealed IP67 cabinet that also holds the heat-generating Mean Well PSU, in full sun → nested heat trap for the battery / boost / modem (not the case).
- Prototype hardware — Dupont + hand-wiring + 18650/PowerBoost; fragile under vibration.
Units: all pulled — 4 in hand (3 dead, 1 working-ish) in Veracruz; team in Querétaro → remote debug. Field firmware is v1 (no thermal log).
Free triage: a unit ONLINE in htracker but OFFLINE in Wialon is a backend victim, not dead hardware. Check that before condemning a radio.
The product in one breath
Rover (HBOX) on the machine + Base Station (Ardusimple AS-PRO-CORS, 110/230 V) publishing RTCM3 corrections over NTRIP. The rover gets corrections over the 4G modem, not the GNSS → recover a dead link by power-cycling the 4G stack, never a GNSS reset. HBOX core: simpleRTK2B Pro (ZED-F9P) · 4G NTRIP Master · STM32F411 watchdog · Mean Well SD-15B-05 (24→5 V) · PowerBoost + 18650 · GX16-5 to the cabinet. 24 V is the production variant.
Invariants (never violate)
- Power-off is the safe state. 2. Never vanish, never loop. 3. Corrections ride the 4G modem, not the GNSS. 4. No material that softens below ~80 °C (PLA-class) in the thermal path — the ASA enclosure complies; design to measured cabinet temperature. 5. Backend forwards without head-of-line blocking; anti-jump never locks out a healthy unit. 6. No secrets in the repo (the committed MSSQL password is a live violation to rotate).
Repo layout
00-Project-Management (plan, ethos, financials, handover, Drive tooling) ·
01-Requirements (SRS, product spec, tracker) · 02-Architecture-Software (backend review) ·
03-Architecture-Hardware (cabinet/HBOX, BOM, PCB brief, watchdog, manual) ·
04-Source-Code (firmware/ · htracker/ · notifications/) ·
05-Analytics-Reports (SQL views — placeholder) · 06-Testing-Validation (RCA, diagnostics) ·
Marketing (datasheet, brochure) · _brand (LaTeX style) · 99-Archive (raw inputs).
Quick start
# Branded docs (XeLaTeX; League Spartan + MADE Evolve Sans):
cd 01-Requirements/HBOX-Ficha-Tecnica && latexmk -xelatex main.tex
# Firmware (own repo 'hbox-firmware', at 04-Source-Code/firmware):
# open blackpillrtkcode_v2/blackpillrtkcode_v2.ino in the STM32duino toolchain.
# ⚠ Bench-test before any field flash — the sandbox cannot build STM32.
# Backend: 04-Source-Code/htracker (ssh://git.helgen.dev:6611/htracker, feature/test500unidades)
Storage model (one home per artifact)
This repo = working source of truth (editable .md/.tex, code). Google Drive
Drogheda (GPS RTK) = finalized exports (branded PDFs, native Docs/Sheets). Second Brain
vault = distilled decisions/lessons. Author in repo → export final to Drive → distill to
vault. Drive upload how-to + mapping: 00-Project-Management/Drive-Upload/README.md. Never
change Drive sharing — that's Leo's call.
Go deeper
- Deep context / onboarding →
00-Project-Management/Engineering-Handover.md - Current priorities →
00-Project-Management/PLAN.md - Machine index →
CLAUDE.md - Failure analysis →
06-Testing-Validation/RCA-2026-06-field-failures.md