tags: [project-drogheda, master-index, gps-rtk, hbox]
|
||
project: Project Drogheda
|
||
author: Helgen CTO
|
||
date: 2026-06-20
|
||
status: Active
|
||
---
|
||
|
||
# Project Drogheda — Master Index (CLAUDE.md)
|
||
|
||
> **Source of truth for this workspace.** Read this first, then
|
||
> [[00-Project-Management/PLAN|PLAN]] for current priorities. **Human engineers
|
||
> onboarding** should start with [[00-Project-Management/Engineering-Handover|Engineering-Handover]]
|
||
> (deep context: product, RCA, fixes, open items, glossary) and the repo `README.md`.
|
||
> You are acting as the
|
||
> **CTO/CSO of Helgen Technologies** — principal hardware/software architect for
|
||
> the Drogheda GPS-RTK fleet. Tone: precise, fail-safe first. Keep this index and
|
||
> its directory table current as files change.
|
||
|
||
> **Codename:** the team / Google Drive / official manual call this project
|
||
> **Drogheda (GPS RTK)**. This local folder was renamed from "Galway" → "Drogheda"
|
||
> on 2026-06-20; all docs now use **Drogheda**.
|
||
|
||
---
|
||
|
||
## ★ Command centre — drogheda.helgen.online (every task closes here)
|
||
|
||
> **Mantra: «Si no está en el sitio, no pasó.»** If it isn't on drogheda.helgen.online, it didn't happen.
|
||
> (Leo, 2026-10-21.) Applies to every task in this project — engineering, docs, firmware, site — Claude's included.
|
||
|
||
The internal site (repo `hbox-docs/`, submodule; MkDocs + Flask backend) is the project's **command centre**:
|
||
Pendientes (kanban, «Por persona»), Ruta a producción per board, Ingeniería decisions, actas per unit, inventory,
|
||
sites, Bitácora/Actividad and every published doc. Leo, Adriana, Michelle, Jesús and the field techs work from
|
||
it. The vault keeps the distilled memory; Drive the client exports; the site is where work is *coordinated and
|
||
closed*. Mechanics (what lives where, how to edit each piece): **`hbox-docs/CLAUDE.md`**.
|
||
|
||
**Start of every task — read the state:** `hbox-docs/_estado/tablero.md` (board snapshot; if missing or older
|
||
than a day, ask Leo for `./scripts/tablero.sh foto`), `hbox-docs/docs/datos/proyecto.json` (Ruta, hitos),
|
||
§0 below, `hbox-docs/docs/hardware/index.md`.
|
||
|
||
**End of every task — the closing loop.** A task is not done until each item that applies is on the site:
|
||
|
||
1. **Board.** Write a lote `hbox-docs/backend/lotes/AAAA-MM-DD_tema.json`: close what's done, open what's next
|
||
(owner + date), comment on what moved, every change with a one-line *why* in es-MX. Reuse ids from the
|
||
snapshot; `buscar` by title when unknown; `si_no_hay` before creating. Format: `hbox-docs/backend/lotes/README.md`.
|
||
Claude never writes the board directly; Leo runs `./scripts/tablero.sh revisar` → `aplicar`.
|
||
2. **Docs.** Source in the `NN-` folder (`AAAA-MM-DD_Drogheda_…`, `date:` front matter, es-MX for the team) →
|
||
`hbox-docs/scripts/sync-docs.sh` MAP → `mkdocs.yml` nav (*Auditorías y pasadas*; superseded → *Historia*,
|
||
with a banner) → section index (`docs/hardware/index.md` …) → Bitácora entry. Figures on the site with the
|
||
doc they explain. Copy to the claude.ai Project (`claude/…`).
|
||
3. **Ruta.** `hbox-docs/docs/datos/proyecto.json` when a board changes stage, a date moves or the week's focus
|
||
changes (`enfoque_inicial`). The live «Enfoque de la semana» is Leo's and Adriana's: propose the wording.
|
||
4. **Decisions.** `hbox-docs/docs/tableros/ingenieria.md` «Últimas decisiones» (dated, newest first, with the
|
||
D-xx-n number) and §0 here.
|
||
5. **Improvements.** If the site got in the way (stale data, missing view, broken link, wrong doc), fix it in the
|
||
same task when small; otherwise a pendiente in the lote (etiqueta «sitio») and a line in the site plan
|
||
(`claude/2026-10-20_Drogheda_Sitio_Inicio-y-Tablero_Propuesta.md`, Phase 2b/3).
|
||
6. **Master index.** §0 status paragraph + §2 directory row (this file). Vault notes only when something
|
||
becomes evergreen (decision, lesson, milestone): `Second Brain/03 Projects/Helgen/Project-Drogheda/`.
|
||
7. **Hand-off.** End the reply with a «Centro de mando» block: what changed on the site, the lote (if any), and
|
||
Leo's commands — sync → `mkdocs build --strict` → commit/push `hbox-docs` → bump the submodule → `deploy.sh`
|
||
→ `tablero.sh revisar` / `aplicar` → `restart actas-hbox` only if `backend/app.py` changed.
|
||
|
||
---
|
||
|
||
## 0. Where we are (2026-06-20)
|
||
|
||
Helgen deployed **HBOX** RTK trackers on heavy port equipment at **Hutchison Ports
|
||
ICAVE (Veracruz)**. They worked "ish," then failed. We are mid-crisis and
|
||
hardening the product for scale. Three independent failure fronts, all being
|
||
fixed in parallel:
|
||
|
||
1. **Backend (confirmed in code).** The production `retranslator.py` blocks the
|
||
whole fleet on any upstream slowness, and an anti-jump filter can permanently
|
||
black-hole a healthy unit → some "dead" units may be backend victims, not dead
|
||
radios. See [[02-Architecture-Software/backend-review|backend-review]].
|
||
2. **Thermal (component-level).** The **ASA** HBOX (UV-stable, softens ~95–100 °C —
|
||
the case is fine) sits sealed inside a sealed **ABS IP67** cabinet that also holds
|
||
the **Mean Well** supply → nested heat trap that cooks the **battery / boost /
|
||
modem** in full sun. See [[06-Testing-Validation/RCA-2026-06-field-failures|RCA]].
|
||
3. **Prototype hardware.** Dupont, hand-wiring, 18650 + PowerBoost — the client's
|
||
(ICAVE) own indictment. Fix = ruggedize now + production PCB.
|
||
|
||
**Status of units:** all pulled from machines. **4 in hand (3 dead, 1
|
||
working-ish)**, physically in **Veracruz**; team in **Querétaro** → remote debug.
|
||
Units run **firmware v1** (no thermal log). Triage:
|
||
[[06-Testing-Validation/remote-diagnostic-protocol|remote-diagnostic-protocol]].
|
||
|
||
**Commercial reality:** productized across **ICAVE, TIMSA, EIT, LCT** (Hutchison
|
||
terminals); target **30 units operational by August**; hundreds of cabinets
|
||
planned. The fix must be production-grade and repeatable.
|
||
|
||
**Logs & observability (2026-06-20).** Analyzed the first real bench + healthy-baseline
|
||
log set (u-blox `.ubx`, 4G-NTRIP console `.log`, server retranslator tcpdump) + the
|
||
caster/F9P config. **GNSS receivers are healthy but no unit reached RTK — all SPS**
|
||
(corrections not applied: free **rtk2go** caster + **RAM-only** F9P config + indoor sky).
|
||
The **4G-NTRIP console is an unreliable health signal** (see §6 — "master-14 fault"
|
||
retracted; only **master 21** confirmed). Built **`hbox-log-tools`** (Log Explorer +
|
||
analyzer + dashboard + manual) and a **Blackpill v2.1 logging spec** to fix observability.
|
||
Canonical: `06-Testing-Validation/2026-06-20_Drogheda_GNSS-Findings-Summary.md`.
|
||
|
||
**Electrical / PCB (2026-06-24).** Watchdog v3 KiCad schematic
|
||
(`03-Architecture-Hardware/kicad/hbox-watchdog-v3.kicad_sch`, ERC-clean). **DFR1015 folded
|
||
on-board → GX16 pin 3 now carries RAW machine ignition (12–24 V)**, not pre-conditioned 5 V.
|
||
**Battery re-added** with a proper charger — **LTC4040 + NTC temperature-qualified charging** on
|
||
the 1S4P pack; the Blackpill cuts charge when the cell is hot (answers the RCA's #1 failure).
|
||
Added **reset** (on-board + external), a **4-LED battery gauge**, and a **power-cutoff** switch;
|
||
fixed two real schematic bugs (EXT_LED disconnect, panel-LED short). Proto = **3 boards** of
|
||
easy-to-find parts (`watchdog-protoboard-BOM-3boards.xlsx` + Spanish shop list
|
||
`watchdog-LISTA-DE-COMPRAS-ES.xlsx`). **Canonical electrical state →
|
||
`03-Architecture-Hardware/watchdog-electrical-design-state.md` — read first for any electrical context.**
|
||
|
||
**PROD schematic complete + PCB layout kickoff (2026-07-02).** `hbox-watchdog-v3-PROD.kicad_sch`
|
||
now carries **all blocks — ERC 0 errors**: LTC4040 Block B **sized to the 12 Ah pack** (RPROG
|
||
825 Ω → 2.42 A ≈ C/5 · RS 8 mΩ → 3.1 A input limit · PFI trip 4.60 V · backup 4.79 V · charge
|
||
4.00 V Li-ion via VSYS-referenced straps), Block E cutoff (P11, MAIN5V→SYS5V), Block F PA4→VEH5V
|
||
re-tap, **Block H fail-safe Modo-B bypass** (K1 *normally-closed* signal relay — corrections
|
||
survive a dead/absent MCU), Block I NTC→PB1 (block 11). New MCU pins live: PB1 · PB3 · PB4 · PB5 ·
|
||
PA8. **Same day (PM): CARRIER-BOARD conversion** — the PROD board now sockets **all three
|
||
modules on female headers**: Blackpill (J1/J2) + **simpleRTK2B Pro as UNO-form shield** (MOD1,
|
||
D0/D1=UART1, D2=RX2, D8=TX2, IOREF=3V3, 5V=SW_5V) + **4G NTRIP Master on an on-board XBee
|
||
socket** (J7/J8 2 mm; VCC = **3V3_MODEM**, a second MP1584 buck off SW_5V — the HP XBee socket
|
||
is 3.3 V not 5 V). Modo B + K1 NC bypass = permanent uplink; RTCM3 downlink direct; P3/P13/H3
|
||
DNP. **Board 120×100 mm**, shield field with SMD-only underneath, XBee field right, access
|
||
parts outside; ERC 0; **carrier DRC baseline saved** (`…-drc-carrier-baseline.txt`; ~29 sub-mm
|
||
placement kisses + by-design under-shield courtyard overlaps). **Next gate: placement review vs
|
||
HBOX/cabinet mechanicals (+ verify D2/D8=RX2/TX2 on a physical Pro), then routing** (5 V ≥0.5 mm,
|
||
SW_5V ≥0.8 mm per kicad-guide). Fab gate unchanged: bench-validate the LTC4040 backup +
|
||
hot-cell charge cutoff on the proto first. Latest proto
|
||
assumptions ledger = `Drogheda_Conexiones-por-Bloque_Proto_v1.xlsx` (*Estado y cambios*) +
|
||
`Drogheda_Guia-Conexion-Protoboard_ES_v3.1.pdf` (LaTeX source in repo:
|
||
`Guia-Conexion-Protoboard/`). Wiring diagrams v2.1 (blocks 1–11) in `circuitikz-wiring/`;
|
||
client decks Avance + RCA refreshed to v1.1.
|
||
|
||
**Proto sensor suite realigned to parts in hand (2026-07-03).** No SHT40 (long lead) → proto
|
||
Block 6 = **AHT10** (0x38 fija, 3V3 only, **alone** on I²C1 — Aosong restriction); **LM35 →
|
||
PA7** (last free ADC channel) joins **NTC→PB1** → **triple temperature** (3 technologies,
|
||
3 electrical paths); humidity = AHT10 only. SHT40/TMP102 stay **PCB-only** (PROD schematic
|
||
untouched). The kit's TP4056 exposes **no TEMP pin** → charger-NTC unused on proto; new
|
||
**PA8 `CHRG_RUN`** high-side cut of TP4056 IN+ (2N3904+IRF9540N; HIGH = charge, MCU absent =
|
||
no charge — **inverted vs PROD `CHRG_EN`**, firmware flag). **Cutoff switch now wired:** nodo
|
||
SYS (OR merge) → SPST → MAIN5V (= Block E/P11, kills vehicle AND battery). Caps in hand
|
||
100 nF/10 µF/100 µF; fan confirmed 2-wire. Docs synced: ledger xlsx · Guía **v2.2** ·
|
||
circuitikz **v2.1** · both proto BOMs · design-state (canonical).
|
||
|
||
**EinarBoard 1.0 Rev 1.1 — audit closed, order-prep pack (2026-07-07).** The PROD carrier is
|
||
officially **Helgen EinarBoard 1.0** (title-block *EINARBoard HBOX 1.0*), **135.1×100.1 mm**
|
||
(grew from 120×100 on Jul-3). Pre-fab audit (`03-Architecture-Hardware/2026-07-06_…PreFab-Audit_v1.0.md`)
|
||
**CLOSED**: H1 Q7 S/D corrected (S=VIN_SW, D=MAIN5V) · H2 Q5/Q6 → Q_NPN_BEC · H3 **Rig 22k**
|
||
(+ **DFR1015 removed** — raw 12–24 V → 22k/10k divider + BAT54 clamp → PA5) · H4 SW_IN → PWR_MID
|
||
1.0 mm; ERC 0 / DRC 0; **M3 closed on a physical Pro** (switchless variants: XBee socket hardwired
|
||
to UART2 — never plug the Pro's USB-XBee port in service) · **M4 HBOX fit verified** →
|
||
**bare-board order RELEASED**; fleet PCBA still gated by **M2** (LTC4040 bench validation) + LCSC
|
||
re-confirm at upload. Order-prep pack in `03-Architecture-Hardware/EinarBoard-Manual/`:
|
||
`einarboard-manual.tex` → branded 21-pp PDF (embeds the **Rev 1.1 schematic full sheet + F/In1/In2/B
|
||
layer plots + silk assembly view**, exported fresh from the Jul-7 saves into `assets/`; the Jul-6
|
||
`…-PROD-schematic.pdf`/`-blueprints.pdf` at 03-AH root are **stale** — pre-H1/H2) ·
|
||
`helgen_einarboard_1.0_production_bom.xlsx`
|
||
(Summary + Internal PCBA w/ verified LCSC + External Integration, live formulas) ·
|
||
`tools/generate_production_bom.py` + `tools/sync_bom.py` (Excel→`pcba_bom.tex` **+
|
||
`external_bom.tex`** — both BOMs in the report; the workbook is
|
||
the BOM source of truth) · `scripts/prep_order_release.sh` (safe cleanup + release commit;
|
||
dry-run default). KiCad sch↔board sync is **manual** (F8 retired). Vault note:
|
||
`EinarBoard 1.0 — System Overview & Toolchain`.
|
||
|
||
**Guía de protoboard v3.0 + 4G alternatives (2026-07-08).** Guía rewritten for a
|
||
low-experience technician: new **visual parts catalog** (`Guia-Conexion-Protoboard/`
|
||
`modulos-pinout.tex`) — physical top-views of every IC module (LM2596 · MT3608 · TP4056 ·
|
||
AHT10 · DFR1015), full **Blackpill 40-pin physical map** (used pins colored, VB/B12 corner
|
||
check), simpleRTK2B Pro with its real silk names (`RX1/TX1/RX2/TX2/IOREF` + XBee switch),
|
||
4G NTRIP Master + BOB-08276 breakout, TO-92/TO-220 pinouts, diode/LED/cap polarity, resistor
|
||
color codes, protoboard anatomy + pre-power checklist; per-block «Piezas de este bloque»
|
||
lines. **Bloque 9 reworked around the XBee pitch:** the 4G is **2.0 mm** (not 1.27 — 10 pins
|
||
= 18 mm) vs protoboard 2.54 mm → bridge options (★ BOB-08276 + 2× PRT-08272 ≈MX$100,
|
||
SANDOROBOTICS CDMX, 1–2 days) + soldering steps + **modem VCC = 3.3 V from SAL via dedicated
|
||
buck** (mirrors 3V3_MODEM; never 5 V) + bulk cap for LTE bursts. Also fixed: **IOREF→3V3 rows
|
||
added to Blocks 8/9** (missing in v2.2 — Pro UARTs are dead without it), Blackpill **USB +
|
||
5 V rail never simultaneous** warning, and the circuitikz socket label corrected 5 V→3.3 V
|
||
(`wiring-blocks.tex`; lámina + Beamer PDFs rebuilt, still content-v2.1). Cheap-4G survey →
|
||
**`2026-07-08_Drogheda_4G-Modem-Alternatives_v1.0.md`**: bench = keep Ardusimple on breakout;
|
||
experiment = LILYGO T-A7670SA (~US$33, TinyGSM NTRIP, ~1 day fw); Aug 30-unit run stays
|
||
Ardusimple (€112 @ ≥50); scale = A7670SA raw (US$9.4, NTRIP-over-AT fw) or Digi XBee 3 LTE
|
||
Cat 1 (US$76, socket drop-in, MicroPython NTRIP on-module). Avoid -E band variants, SIM7000G
|
||
(Telcel LTE-M provisioning risk).
|
||
|
||
**Production audit V5.6 / V5.7 / v6 (2026-10-16).** None is ready to order. **V5.6** (`hbox-watchdog-v5`,
|
||
kicad `5a93232`) is close: pass 3 of layout (~1 day) + firmware 0.7.0 (`board_v56.h`, also runs V5.7 —
|
||
same MCU pins) + a 5-board pilot. **V5.7** (`hbox-watchdog-v57`, `a7c0116`): V5.6's pass-2 power fixes were
|
||
not replicated (`/BAT_PLUS` on In1 at 0.5 mm again), U25 EP has 0 vias, FB divider 22 mm away; input range
|
||
without the SD-15B = **9–32 V DC** (TVS D10 SMBJ33A is the ceiling; recommend SMBJ33CA). **v6**: PCB never
|
||
updated from the verified schematic (70 parity diffs incl. JP2 Li-ion, R52 open) and no firmware replaces the
|
||
4G NTRIP Master yet. Findings that apply beyond one board: the **7 V5.5 production holes** (MH5/MH6/MH4 3.2 mm,
|
||
**MH4 at (185.2, 90.3) — 193.2 is only the old footprint anchor**; MH7/MH9/MH10 ArduSimple; MH11 clamp) were
|
||
lost from V5.6/V5.7 by *Update PCB* → restore with `kicad/tools/t25_mounting_holes_v55.py` (board-only
|
||
footprints); and the **LTC4040 input limit is ≈ 1 A instead of 2.5 A on V5.5/V5.6/V5.7** (VIN/CLN sense taps
|
||
include ~19 mm of copper; fix = Kelvin to RS1 pads). D8 (identify v6 by the SC7A20) no longer works — V5.6/V5.7
|
||
have it too. Canonical: `03-Architecture-Hardware/2026-10-16_Drogheda_Auditoria-Produccion_V5.6-V5.7-v6_ES_v1.0.md`
|
||
+ Michelle's `2026-10-16_Drogheda_Instrucciones-Michelle_V5.6-V5.7-Pasada-3_ES.md` (site: `hardware/auditoria-produccion-16oct/`).
|
||
|
||
**v6 production audit + weekend plan (2026-10-16 PM) → re-audit of all three + T30 (2026-10-19).** Audited on
|
||
HBox_PCB `4f4681f` (Michelle's pass 3 + Leo's merge fix). **V5.6** (`hbox-watchdog-v5`, `240e2c3`) is **almost
|
||
ready**: `/BAT_PLUS` off the inner layers, `/3V3_MODEM` 1.0 mm, U7 EP 4 vias, no loose copper, RS1 Kelvin intact;
|
||
DRC = only the 3 MOD1 NPTH-in-courtyard errors (by design), 0 unconnected. **T30**
|
||
(`kicad/tools/t30_v56_v57_mecanicos.py`; dry-run by default, `.T30bak`, aborts on geometry drift, DRC-verified on
|
||
copies) adds parallel vias at every single-via power layer change, turns the 4 "micro" vias into through vias
|
||
(`/NTC` 0.3/0.1 → 0.5/0.3), takes JP/TP/MOD1 out of BOM/CPL (PCB + schematic), sets title block + JLC04161H-7628
|
||
stackup; on V5.7 also +11 GND vias at U25 and deletes 12 loose items. After T30, V5.6 needs ~1 h of layout (L7
|
||
≤ 5 mm from U7 + Dbk2, U6 VSYS 0.3 mm escape, 3 single vias, DRC exclusions) → Gerber/BOM/CPL → 5-board pilot.
|
||
**V5.7** (`f3f35f4`) now replicates V5.6, but **`/SYS5V` runs 10.9 mm on In2 at 0.5 mm under K1 (blocker)** and
|
||
the U25 input loop is 52 mm² (target < 30) → ~half a day. **v6** (`00a9af4`, only +15 GND vias since the audit):
|
||
**NOT READY**, the 8 blockers of the 16-oct v6 audit stand (U25 still the AP64350 part code, no mounting holes,
|
||
5 V on In1/In2 at 0.5 mm, charger U6, U25 layout, modem RF on In1, GND vias, stackup); T25 `--set v6` +
|
||
**T28** (`kicad/tools/t28_v6_mecanicos.py`) still apply; weekend plan **rev 1.1** shifted one week (24–25 Oct,
|
||
31 Oct–1 Nov, pilot of 20 ordered Mon 2-Nov, G2 ≈ 22-Nov; JLC pre-orders not shifted). **Merge incident
|
||
(19-oct):** `40decf8` wrote git conflict markers into both V5.x PCBs — Michelle's branch from `f65c830` vs the
|
||
Friday 18:00 auto-sync (`2889ba2`) of KiCad files from Leo's Mac; fixed in `240e2c3` + `.gitattributes`
|
||
`merge=binary` (`4f4681f`). Rule: one person per board at a time, scripts only with KiCad closed and a clean
|
||
tree; recommended: keep `kicad/` out of the auto-sync (decision D-19-3). Canonical:
|
||
`03-Architecture-Hardware/2026-10-19_Drogheda_Re-Auditoria_V5.6-V5.7-v6_ES_v1.0.md` +
|
||
`2026-10-19_Drogheda_Instrucciones-Michelle_V5.6-V5.7-Pasada-4_ES.md` (Michelle) +
|
||
`2026-10-16_Drogheda_Auditoria-Produccion_v6_ES_v1.0.md` + `2026-10-16_Drogheda_Plan-Fines-de-Semana_v6-Produccion_ES.md`
|
||
(site: `hardware/re-auditoria-19oct/`).
|
||
**V5.6 triage (2026-10-19 PM, on Leo's 18:59 working copy after T30 `7650b96`).** One critical item, new and
|
||
inherited from V5.5: **U6 (LTC4040) has no capacitor at its VSYS pins 1/24** (nearest C34 10 µF at 11.5 mm,
|
||
C32/C33 47 µF at 15 mm, all behind vias). The datasheet ranks the VSYS cap above everything else (single hot
|
||
loop: buck 2.25 MHz / boost 1.125 MHz; VSYS abs max 6 V). Fix = add **C129 10 µF 0603 X5R 10 V (LCSC C19702,
|
||
basic)** vertical at ≈ (153.07, 111.95) with a GND via, rerouting `/PROG`, `/CLPROG_TP`, `/CHRG_EN` (U6 pins
|
||
2–4); no part moves. The 18:59 save also lost T30's two `/MAIN5V` vias at (145.15/146.15, 97.6) and put
|
||
`/3V3_MODEM` through 2 single vias. L7 (8.8 mm from U7) and the V5.5-inherited converter layouts (L6 11.7 mm,
|
||
L8 35 mm from U12, Dbk1 18 mm from U2) stay for the pilot and are measured on the bench. Canonical:
|
||
`03-Architecture-Hardware/2026-10-19_Drogheda_V5.6_Clasificacion-Criticos_ES_v1.0.md` (site:
|
||
`hardware/v56-clasificacion-19oct/`).
|
||
**T31 — C129 in, Dbk2 out (2026-10-20).** `kicad/tools/t31_c129_vsys_quitar_dbk2.py` (dry-run by default, `.T31bak`,
|
||
deterministic UUIDs, aborts on drift, idempotent) applied to both V5.6 and V5.7 schematics: **C129 10 µF 0603 X5R 10 V
|
||
(CL10A106KP8NNNC, C19702) on `/MAIN5V`–GND next to U6** (the missing VSYS cap); **Dbk2 removed** (U7 AP64350 is
|
||
synchronous → D-19-2 resolved; the deleted diagonal wire was U7.8's only link to SW3_NODE, so U7.8 now carries its own
|
||
SW3_NODE label); V5.6 also loses a stray no-connect flag on U10.14 (SC16IS752 SDA, wired to I2C_SDA — KiCad's ERC
|
||
reports it only depending on read order). Verified on copies: ERC identical (0 errors), netlist only +C129/−Dbk2,
|
||
schematic parity = exactly "C129 missing" + "Dbk2 extra". Next: **Leo runs F8** on both boards (C129 arrives unplaced);
|
||
Michelle places it at ≈ (153.07, 111.95) — same spot and same 3 signals to reroute on V5.7 — and deletes the Dbk2
|
||
branch (V5.6: 5 F.Cu tracks, 18.6 mm; V5.7: 4 tracks, 18.3 mm). Pasada-4 instructions → v1.1 (§0b, A-1, B-0, B-3);
|
||
figure `img/2026-10-20_Drogheda_T31-C129-y-Dbk2_v1.0.png`.
|
||
**Audit of Michelle's pass 4 (2026-10-21; HBox_PCB `85e7602` V5.6, `1416dcb` V5.7; T31 + F8 in, parity = only PF*).**
|
||
Both boards: C129 placed at (152.2, 111.8) and tied to U6.1/24 on F.Cu; Dbk2 branch gone; **U7 rotated 180°** (not in the
|
||
plan) → L7.1–U7.8 4.0 mm (V5.6) / 0.4 mm (V5.7), SW node 13 → 10 / 6 mm, but U7.2 (VIN) now 5–6.5 mm from C119–C121, fed through
|
||
ONE via under the IC, COMP node 13 → 23 mm. **V5.6 NOT READY: new short `/MODEM_EN`–GND at R106.2** (R105/R106 moved 1.75 mm,
|
||
the MODEM_EN track end now sits on R106's GND pad → modem never powers) + `/SYS5V` B.Cu at 0.09 mm from a U7 EP via (DRC errors).
|
||
Both: VSYS→/MAIN5V down to ONE via, C129 GND has no via (0.25 mm track only), RS1 entry via moved onto the RS1.1 pad edge and
|
||
its 2nd via dangling; V5.6 3V3_MODEM still 2 single vias. **V5.7: K1 blocker solved** (`/SYS5V` off In2), L22.1 2.3 mm from
|
||
D34.1, but C149/C150 untouched (U25 input loop 52 mm²) and single vias on the 5 V path ((168.0, 110.6) + (162.85, 113.19) carry all of U25 → RS1;
|
||
(145.9, 57.6) is only the C78/C30 bulk + NTC/5V_SENSE divider branch — corrected PM, the AM text said all of U25's output); 4 one-layer vias. Lesson: DRC with `--refill-zones` needs the project `.kicad_dru` in the copy, else
|
||
false unconnected items. Decision D-21-1 for Leo: C130 100 nF 0402 (C1525) at U7.2. Canonical:
|
||
`03-Architecture-Hardware/2026-10-21_Drogheda_Auditoria-Pasada-4_V5.6-V5.7_ES_v1.0.md` (site: `hardware/v56-v57-auditoria-21oct/`).
|
||
**T32 + T33 (2026-10-21 PM; D-21-1 approved by Leo).** `kicad/tools/t32_c130_vin_u7.py` (both schematics; imports T31's
|
||
helpers, so both stay in `tools/`): **C130 100 nF 0402 X7R 16 V (CL05B104KO5NNNC, C1525) `/SYS5V`–GND = U7.2 VIN bypass**;
|
||
ERC identical, netlist only +C130. `kicad/tools/t33_v56_v57_auditoria_21oct.py` (both PCBs; per-board plan embedded as JSON;
|
||
dry-run default, `.T33bak`, uuid5, aborts on drift): V5.6 R106 short removed (MODEM_EN track now ends on R105.1) and
|
||
`/SYS5V` under U7 narrowed 1.0 → 0.7 mm (0.24 mm to the EP via); both: 2nd VSYS→/MAIN5V via; V5.6 +2 vias at each
|
||
`/3V3_MODEM` layer change and at `/SYS5V` (136.97, 86.96)/(146.37, 86.96) (U12 = MP1584 /3V3_ETH branch); V5.7 +2 at
|
||
`/SYS5V` (158.6, 57.925) and (136.97, 86.96), via (163.79, 113.19) joined on B.Cu so (162.85, 113.19) is backed; 5 one-layer
|
||
vias + a 0.14 mm stub deleted. Verified on Mac copies (DRC with `.kicad_dru` + refill + parity): only the 3 MOD1 errors,
|
||
0 unconnected, 0 dangling; parity = "C130 missing" + PF*. Left for Michelle (pass 5, audit section 3): F8; C130 at U7.2 with
|
||
its own GND via + 2nd U7.2 feed via (needs EN/FREQ/COMP moved ~0.8 mm); C129 GND via(s) (move PROG/CLPROG_TP/CHRG_EN
|
||
~0.5 mm); 2nd RS1 entry via; V5.7 C149/C150 + (168.0, 110.6) (+ (145.9, 57.6) if it fits); MH7/9/10 exclusions; optional
|
||
Rcomp2/Ccomp2/Rfreq2 closer (COMP 13 → 23 mm after the U7 rotation). The planner found no room for those, nor for V5.7
|
||
(146.37, 86.96) (U12 branch, accepted 19-oct). Lessons: deleting a via can leave a sub-mm stub (delete it too); a new via
|
||
with a long stub can split a GND pour island (1 unconnected) → always re-run DRC with parity on the copy before applying.
|
||
Figure `img/2026-10-21_Drogheda_T33-Arreglos-y-Pendientes_v1.0.png`.
|
||
**21-oct night: v6 T25 + T28 applied; V5.6/V5.7 pass 5 reviewed.** T28 (and T25 `--set v6`) had never been run (the plan
|
||
had them for Sat 24, 8:00). Applied by Claude on Michelle's `9255b84` after a copy test (KiCad 10.0.4 DRC with `.kicad_dru`,
|
||
refill, parity): 22 new errors, all at MH4 (D23/D24 inside, `/NTC` In2, `/SIM_RST`, a GND track) and **MH8: Michelle had moved
|
||
D34 + 2 GND vias into the v6 corner hole, invisible because the holes were missing**; 0 unconnected; parity = 19 PWR_FLAG.
|
||
T28 closes v6 blockers 1 (U25 LCSC Part) and 8 (stackup) + U6 paste 50 %, 114 solid pads, RF 0.35, title block. v6 block A
|
||
progress: L22.1 2.2 mm from U25.8, 6 EP vias, C149 0.75 mm, 5 GND vias at D34.A, `/VEH5V` L22 → RS1 all F.Cu 1.0 mm, 0 vias —
|
||
but **D34 is now 13 mm from the SW pin (hot loop ≈ 47 → ≈ 115 mm²)** and R53/R54 (LTC4040 BSTFB, belong ≤ 3 mm from U6.18)
|
||
sit in D34's spot. Blockers 3 (`/VIN_SW` In2), 4 (U6), 6 (RF LTE In1), 7 (111 GND vias) unchanged. V5.6/V5.7 pass 5
|
||
(`6458c5d`): DRC only MOD1, parity only PF*; C130 placed 1.8 mm from U7.2 with its own GND via (both); V5.6 C129 GND via;
|
||
V5.7 (168.0, 110.6) doubled. **Regression in both: the moved RS1 entry via now sits ON the 0.25 mm U6.6 VIN sense trace →
|
||
not Kelvin (≈ +0.3–0.4 mΩ, input limit −3–4 %); the new "2nd RS1 via" (149.48, 118.8) is F.Cu-only (dangling).** Still open:
|
||
U7.2 single input via, V5.7 C149/C150 not rotated (loop ≈ 56 mm²) and no C129 GND via, MH7/9/10 exclusions, stubs
|
||
(`/RS485_B` V5.6, `/24V` V5.7). Lesson: "move the via off the pad" must also say "not onto the sense trace"; re-run
|
||
kelvin2 after every change near RS1. Canonical: `03-Architecture-Hardware/2026-10-21_Drogheda_Estado-v6-T25-T28_ES_v1.0.md`
|
||
(site `hardware/v6-estado-21oct/`) + §5 (pass 6 list) of the 21-oct audit.
|
||
**21-oct night, later: pass 6 done by Claude with T34–T37 (Michelle out; Leo: "start step by step, V5.6 first").**
|
||
`kicad/tools/t34_v56_pasada6.py` (V5.6: RS1 Kelvin restored — U6.6 sense rerouted (151.55, 115.8) → (151.55, 117.7) → pad 1 from
|
||
its inner side; 2 `/VEH5V` entry vias 0.6/0.3 at (150.7, 115.9)/(150.9, 116.6) joined on F.Cu + B.Cu; dangling via (149.48, 118.8)
|
||
and the 0.01 mm `/RS485_B` stub deleted; MH7/9/10 DRC exclusions written to `.kicad_pro`) · `t35_v56_via_u7.py` (V5.6: 2nd U7.2
|
||
input via (138.7, 117.45)) · `t36_v57_pasada6.py` (V5.7: same RS1 fix, U7 via (138.925, 116.525), `/24V` B.Cu dead end trimmed to
|
||
(182.4, 69.4), exclusions) · `t37_v57_c129_gnd.py` (V5.7: C129 GND via (151.25, 112.5), 0.18 mm from the pad — room made by moving
|
||
the `/IGATE` and `/F0_SEL` B.Cu horizontals and a 0.74 mm 45° bump of `/CHRG_FAULT` + `/CHRG_STAT` on In2). All: dry-run default,
|
||
uuid5, `.T3xbak`, abort on drift, idempotent; tested on Mac copies (KiCad 10.0.4 DRC with `.kicad_dru` + refill + parity), then
|
||
applied to HBox_PCB (same SHA-256 as the copies). Both boards now: only the 3 MOD1 errors (excluded), 0 unconnected, 0 dangling,
|
||
parity only PF*, RS1 Kelvin on VIN and CLN, every mounted part with LCSC → **copper ready for Gerber** (next: Leo commit/push,
|
||
B + DRC in KiCad, Fabrication Toolkit Gerber/BOM/CPL). **V5.7 C149/C150 rotation dropped — proposal D-21-2, needs Leo's OK:** of
|
||
the ≈ 56 mm² pad-centre loop, ≈ 40 mm² is U25 → D34 alone (VIN and SW on opposite sides of the HSOP-8, D34 above it) → ≈ 46 at best
|
||
by rotating, < 30 needs D34 moved; and In1 is solid GND under the whole stage (207/208 mm², 0.21 mm below F.Cu), so the HF return
|
||
mirrors the forward path → bench-check SW/VIN ringing at 9/24/32 V, 2.5 A. Lesson: over a solid plane the pad-centre polygon
|
||
overstates the hot loop; judge forward-path length (SW pin → diode) and GND vias at Cin− and the anode. Optional left: V5.7
|
||
`/VEH5V` (145.9, 57.6) 2nd via (C78 branch), U7 compensation closer. Canonical: §6 of the 21-oct audit; figure
|
||
`img/2026-10-21_Drogheda_Pasada-6-T34-T37_v1.0.png`.
|
||
**21-oct night, later still: T38 on the real v6 (Leo: "work on the real V6").** `kicad/tools/t38_v6_courtyards_mh.py`
|
||
(no part moved): (1) the 8 easyeda2kicad footprints of `Drogheda-v6.pretty` had courtyard = body outline with every pad outside
|
||
(L22's was a triangle) → the DRC was blind on U19/U20/U23/U24/U25/U26/D22/D27/J12/J13/L22. New courtyard = bbox(body ∪ pads) +
|
||
0.25 mm, written on the board AND in the library (v6 lib-mismatch count unchanged, 81). It exposed 14 overlaps: 13 margin-only
|
||
(physical gap 0.29–0.76 mm) and 1 real (C153, 1210, 0.3 mm under L22's body). Exclusions can't be scripted: KiCad matches
|
||
`type|x_nm|y_nm|uuid|uuid` on the exact marker position, which only its own DRC computes (tested: footprint-anchor positions don't
|
||
match) → Michelle excludes them in the GUI at the end. V5.6/V5.7 use 2/4 of these footprints (U7, U26; + U25, L22 on V5.7) and
|
||
were not touched: their DRC now shows 2/4 "doesn't match library" warnings (courtyard only; with the new courtyard they'd have only
|
||
margin overlaps, 0.40–0.56 mm) → don't update those footprints before their Gerbers. (2) **New finding:** the v6 B.Cu is a `/3V3`
|
||
plane and reached 1.85 mm from all 5 MH centres, inside their 6-mm mask openings (both faces): bare 3V3 under the standoff/insert,
|
||
bare GND under the screw head → 3V3–GND short through metal hardware. Rule added to `hbox-watchdog-v6.kicad_dru` (outer layers,
|
||
`A.Type == 'Pad' && A.memberOfFootprint('MH*') && B.NetName != 'GND'` → `hole_clearance` 2.4 mm = 4.0 mm from the centre); the zone
|
||
filler honours it (B.Cu /3V3 now exactly 4.0 mm at all 5; F.Cu GND stays at 1.85, as V5.5) and the DRC now flags MH4's `/SIM_*`
|
||
(11 errors). V5.6/V5.7 don't have the problem (outer pours GND, `/3V3` on In2). (3) MH6: `/3V3` 3.02 mm on F.Cu → via (61.6, 130.3)
|
||
+ B.Cu along y = 130.3 / x = 69.5 to H4.1, 4.06 mm. DRC 22 → 52 errors, all known (MH4 28, MH8 10, courtyards 14); 0 unconnected;
|
||
parity 19 PF; warnings unchanged (262). **Block A correction:** rev 1.0 of the v6 state said "L22 stays, D34 goes below pin 8" —
|
||
impossible (U25-to-P1 gap 4.1 mm < D34's 6.7 mm) → **proposal α** for Michelle (**D-21-3, needs Leo's OK**): R53/R54 next to U6.18 first; D34 rot 90 at
|
||
(181.0, 121.75) (cathode 3.4 mm from the SW pin); L22 at (192.1, 122.5) (L22.1 8.7 mm; 0.62 mm copper-to-edge — check the HBOX
|
||
wall); 4 GND vias at the anode; `/VEH5V` out of L22.2 under the inductor body (y 116–118) to R51.1; In1/In2 cleared under SW/L22;
|
||
MH8's 2 GND vias deleted. Plan targets corrected (plan rev 1.3): D34.K ≤ 3.5 mm, L22.1 ≤ 9 mm, SW copper ≤ 10 mm² outside the
|
||
pads (the pads alone are 33 mm²), pad-centre loop ≤ 60 mm² (today 115). MH4 stays with Michelle (SIM ESD re-placement + reroute).
|
||
Canonical: v6 state doc rev 1.1 (§3, §5); figure `img/2026-10-21_Drogheda_v6-T38-Courtyards-U25-Barrenos_v1.0.png`. Lessons:
|
||
easyeda2kicad footprints ship body-only courtyards — sweep "pads outside courtyard" on every imported footprint; and check pours,
|
||
not only tracks, against hardware keep-outs.
|
||
**Final production audit of V5.6 + V5.7 (2026-10-22; Leo: "all my other sessions say we're almost production ready… boards are
|
||
to be ordered today").** Protocol first (`03-Architecture-Hardware/2026-10-22_…_Protocolo_ES_v1.0.md`, the "reprompt"), then the
|
||
audit on the fab packages `production/HBOX_v5_Rev6_PROD` (V5.6, `hbox-watchdog-v5`) and `HBOX_v5_Rev7_PROD` (V5.7, `hbox-watchdog-v57`).
|
||
**Verdict: GO for the 5 + 5 pilot today with three order conditions that touch no copper** — (1) JLC *Epoxy Filled & Capped* vias +
|
||
X-ray on U6 (3 thermal vias inside the 50 % paste windows of the 0.5 mm QFN: the V5.5/V4 bridging cause); (2) rotation/polarity
|
||
check in the JLC viewer for U6, U7, U25, U26, L22, Q7, U16, D34, D10 and the electrolytics (easyeda2kicad footprints never fabbed,
|
||
no Toolkit rotation table); (3) BOM D10 SMBJ33A → SMBJ33CA (C8838 / C2688178; the unidirectional part opens SMD fuse F2 on a reversed
|
||
harness). **NO-GO for the 108 / 322 until the pilot passes the bench with firmware 0.7.0** — no firmware enables the modem of these
|
||
boards today (`MODEM_EN` = PC3 is new; 0.6.3 also reads the NTC on the wrong pin, floats at 4.00 V instead of 3.50 V LFP and reads
|
||
ignition digitally — 12 V lands at 1.38 V, undefined). Package verified: Gerbers identical to a kicad-cli regeneration with a fresh,
|
||
project-aware zone fill (0.000 mm² XOR; masks/paste/silk/drills identical), DRC = only the 3 MOD1 errors, 0 unconnected, parity only
|
||
PWR_FLAG, RS1 Kelvin on VIN and CLN on both, BOM/CPL = PCB (226/229 placed, all with LCSC). **P-1:** both repo `.kicad_pcb` carry the
|
||
pass-5 zone fill (the Toolkit refilled at export; a non-refilled export shorts GND onto the T35/T37 vias) → Leo opens, B, saves,
|
||
commits; rule **D-22-3**: every T script that touches copper ends with a GUI refill before the commit (lesson: headless refill
|
||
without the `.kicad_pro` beside the board gives a different fill — copy the project, not just the board). Electrical: LTC4040
|
||
(PFI 4.40/4.51 V, backup 4.79 V, 2.5 A Kelvin, 1.40 A, 3.50 V LFP, NTC +10…+60 °C), AP64350 modem rail (3.33 V / 500 kHz from
|
||
SYS5V, EN off by default, C130, C43 220 µF — the V5.5 modem brownout is gone by design), TPS54360B (5.32 V / 600 kHz, 9–32 V, EN
|
||
floating) all checked against the datasheets. Ports usable with two rules: RS-485 DE//RE hang on RTSA (transmitter on from reset
|
||
until the firmware writes EFCR — ~1 s bus hold) and H4 (TTL) vs P16 (RS-232) never together (shared SER_RXB); for 108/322 swap
|
||
SP3485 → THVD1410DR (C2671345) and MAX3232 → TRS3232E (P-5, same pinout). Battery: 2.9 W avg / 8.7 W peak (< 12 W boost); sleep
|
||
floor ≈ 75 mW only with the W5500 in PHY power-down (no 3V3_ETH enable, E-3) → ≈ 5 days at 45 s every 10 min; thresholds LFP
|
||
2.95 / 3.20 V; 10-min cycle = STOP + RTC (LSE FC-135 with 12 pF caps runs fast, LSI fallback) + SC7A20 INT1 (PB9) + ordered
|
||
power-down (MODEM_EN, PA1, K1 released, UARTs Hi-Z). V5.7-only: ignition 12 V → ADC with 0.80/0.55 V hysteresis (E-7); U25 input
|
||
loop ≈ 56 mm² stays (D-21-2 holds) and is bench-checked at 9/24/32 V, 2.8 A; two series input vias (E-10). 30 findings (P-1..P-8,
|
||
E-1..E-16, F-1..F-8), 16 risks (5×5 before/after), 6 easy wins. Deliverables: `03-Architecture-Hardware/
|
||
2026-10-22_Drogheda_Auditoria-Final-Produccion_V5.6-V5.7_ES_v1.0.md` (canonical, site `hardware/auditoria-final-22oct/`) ·
|
||
`Auditoria-Final-V56-V57/` (LaTeX sources, 33-pp PDF, 19-frame Beamer, figures, scripts: `gerb.py` Gerber parser/renderer, `gcmp.py`
|
||
primitive/XOR comparison, `netparse.py`, `copper.py` connectivity + Kelvin + cut-via test, `riesgos.py`) · 8 figures in `img/` ·
|
||
**`04-Source-Code/firmware/hbox_v5_bringup/board_v56.h`** (64-pin map from the 22-oct netlist, V5.6 = V5.7; needs the
|
||
`#elif defined(HBOX_BOARD_V56)` include in the .ino) · lote `2026-10-22_auditoria-final` (closes `t-v56-revision-gerber`, re-aims
|
||
`t-v56-piloto` at today's 5 + 5 order with the checklist, `t-fw-070` in progress with F-1..F-8 sized, creates `t-p1-relleno-commit`,
|
||
`d-22-1-go-piloto`, `t-preorden-108-322-bom`). 0.7.0 work list: F-1 0.7.0-pre 1 day · F-2 backup cycle 3–4 days · F-3 SC16IS752 1 day ·
|
||
F-4 field Ethernet 2 days · F-5..F-8 2 days. **13:30 re-verification on Leo's 13:00 saves** (V5.6 `338ee14b`, V5.7 `85baca51`, packages
|
||
regenerated): saved fill = fresh project-aware refill (0.000 mm² both), package = file, copper and all 11 layers + drills identical to the
|
||
morning audit, BOM/CPL same SHA (D10 still SMBJ33A → condition 3 stays), DRC unchanged → **P-1 closed, verdict unchanged**, commit pending.
|
||
Only non-fill diff in the files = silkscreen text `render_cache` (cosmetic). Re-check tooling kept in `Auditoria-Final-V56-V57/scripts/`:
|
||
`verify_mac.sh` (kicad-cli DRC + as-saved Gerber + project-aware `refill.py` + Gerber) and `gcmp_b.py` (A saved-vs-fresh · B package-vs-file ·
|
||
C/D vs the audited copper) — 5 min after any change, before paying; the quick wins run in a parallel session.
|
||
|
||
**22-oct: T39 — v6 block A done by script (Leo, 09:40: "do the changes on V6, it's the priority").** `kicad/tools/t39_v6_bloque_a.py`
|
||
(requires T38; drift-checks every part/track it touches; idempotent; `.T39bak`). Proposal α applied: D34 rot 90 at (181.08, 121.75),
|
||
L22 at (192.18, 122.5) — 0.08 mm east of the proposal so D34's courtyard doesn't hit C152's (U25|C152|D34|L22 is exactly full up to
|
||
the 0.5 mm edge rule; L22.2 copper now 0.53 mm from the edge, body 1.26 mm → HBOX wall check still open); R53/R54 to (178.25, 109.6)
|
||
/ (178.25, 111.1) under JP2 (R53.1 on the JP2.1 `/MAIN5V` via, R53.2/R54.1 on the existing `/VFB_BST` via to U6.10/U6.18, R54.2 to a
|
||
new GND via) — 3.4 mm from U6.10 but 6–7 mm from U6.18, so block B step 6 is only half done; SW node as F.Cu tracks (1.4 mm along
|
||
y = 124.4 pin 8 → D34.K → L22.1, C152.2 0.9 mm); `/VEH5V` 2 mm from L22.2 up and under the inductor body to R51.1; 4 GND vias at
|
||
D34's anode + 1 more at C149 and C150 + R54's; MH8's 2 GND vias deleted; In1/In2 cleared under the stage: `/VFB_BST` 24 mm and
|
||
`/MAIN5V` 15 mm deleted, `/I2C_SDA` re-layered to B.Cu and `/I2C_SCL` rebuilt on B.Cu inside SDA (they crossed once on one layer),
|
||
R121's 5 V sense to B.Cu. Results: D34.K 3.52 mm (target 3.5), L22.1 8.79, SW 9.8 mm² outside pads, pad-centre loop 56.5 (C149) /
|
||
60.8 (C150) vs 114.6 before; KiCad 10 DRC (refill + parity + `--all-track-errors`): 0 unconnected, parity 19 unchanged, errors
|
||
52 → 44 (≈ 33 MH4 + 11 pre-existing margin courtyards), warnings 262 → 254, one new warning (0.3 mm `/MAIN5V` tap, PWR_HI rule).
|
||
Live file refilled with kicad-cli next to the `.kicad_pro` = byte-identical to the tested copy (`97ea7e45`) → meets D-22-3 (a
|
||
project-aware CLI refill equals the GUI fill: V5.6/V5.7 CLI-refilled Gerbers are identical to the Toolkit's). Not committed yet.
|
||
Lessons: (1) **any F.Cu zone with priority above the GND pour makes KiCad 10 re-fill the whole F.Cu GND differently** (40 k → 65 k
|
||
points, +0.7 MB, 2 starved thermals far away at J11.B12/U26.1) — so the SW node/VEH5V are tracks, not zones; (2) KiCad 10 reports
|
||
a different subset of MH4 pairs on every run of the same file (29–34 errors) → compare DRCs with `--all-track-errors` and treat
|
||
MH4 counts as ± a few; (3) `device_commit_files` re-uses a cached upload for the same staged path → re-commit under a new name;
|
||
(4) zip in the mounted folder fails (temp + rename) → use `tar czf`. Still open in block A: Rig1 4.79 mm from P1.3 (≤ 3), dead `/24V`
|
||
(schematic decision), C150 2.31 mm from pin 2 (≤ 2; C149 0.75). Same day, independent check of the V5.6/V5.7 packages (agrees with
|
||
the final audit): gerbv 400-dpi XOR of every layer vs a project-aware CLI regeneration = 0; after Leo's 13:00 refill + save the saved
|
||
boards export identical Gerbers without refilling (P-1 closed for V5, not committed); extra notes: 19/18 THT parts are in the
|
||
BOM/CPL (JLC will quote THT assembly), the Toolkit upper-cases designators in BOM and CPL (consistent, no collisions), and
|
||
`production/netlist.ipc` is the V5.7 one (last run). Canonical: v6 state doc rev 1.2 §6 + plan rev 1.4; figure
|
||
`img/2026-10-22_Drogheda_v6-T39-Bloque-A_v1.0.png`; lote `2026-10-22_t39-v6`.
|
||
|
||
**Command centre (2026-10-21, 20:00; Leo: «this is the command centre for all tasks»).** Rule and closing loop
|
||
in ★ above. Built the bridge that lets Claude's tasks reach the board: `hbox-docs/backend/tablero.py` (stdlib;
|
||
foto / revisar / aplicar / pendientes through the live API as `X-Remote-User: claude`; ledger
|
||
`/srv/projects/drogheda/lotes-aplicados.json`; never re-applies, never touches Hecho unless asked, refuses edited
|
||
lotes) + `hbox-docs/scripts/tablero.sh` (Mac side; `deploy.sh` now refreshes `_estado/` and reports pending
|
||
lotes). First lote `2026-10-21_pasada-6`: closes the pass 2–5 tasks and the V5.7 source/close tasks, puts
|
||
`t-v56-revision-gerber` in progress for V5.6 + V5.7 (Leo + Claude, 22-oct), creates D-21-2 (Leo), the 5 + 5 pilot
|
||
order (if not already there), the V5.7 bench task (Jesús + Claude) and v6 «D34 back next to U25.8, MH8 clear,
|
||
R53/R54 ≤ 3 mm from U6.18» (Michelle, 24-oct); comments on the v6 tasks. Tested on a seeded copy of the real
|
||
backend incl. a simulated 16-oct board. Site: Ruta/hitos/enfoque_inicial to pass 6 (V5.6 and V5.7 «Lista para
|
||
Gerber», pilot ≈ 22-oct), Ingeniería decisions + Bitácora entries, «El sitio es el centro de mando» in the
|
||
engineer's guide (v1.2), first rule on the home page. Vault: playbook + Drogheda memory set brought to 21-oct.
|
||
**Crisis mode (2026-10-22, 13:30; Leo).** Project traffic light **red**. Causes: no payment received this month →
|
||
operating tight, no significant purchases; TIMSA (Manzanillo) blocked by an administrative issue with our vehicle there;
|
||
EIT (Ensenada) waiting for material shipped from Manzanillo; ICAVE (Veracruz) bad weather → short field windows, with
|
||
faults that can only be investigated on site; software: a Wialon retranslator pointing to our server is missing (to
|
||
compare RTK vs the legacy GPS in our monitor) and sudden disconnections must be investigated immediately. Immediate goal:
|
||
**1–2 units installed per site**. Paying suppliers unblocks most tasks. Board: lote `2026-10-22_crisis` (cobranza,
|
||
priority purchase list, purchases/pre-orders/ferretería blocked on payment, per-site install tasks, TIMSA vehicle, EIT
|
||
material, ICAVE field investigation, Wialon retranslator, disconnections, field owner per site, periodic meetings).
|
||
Site: tasks get `sitios` (icave · timsa · eit · lzc · qro; unset = Querétaro) with a site filter, new track
|
||
**Gestión**, a home traffic light with per-site colors, and a **Juntas** page (standup + quick wins recorded with
|
||
Gemini → Claude writes a lote → Leo applies). Deploy needs `restart actas-hbox` **before** `tablero.sh aplicar`.
|
||
|
||
---
|
||
|
||
## 1. System architecture (corrected from the BOM, 2026-06-20)
|
||
|
||
```text
|
||
Machine power+ignition (12/24/48/110/230 V, per equipment)
|
||
│
|
||
▼ ┌──────────────── Gabinete IP67 (ABS, Yetlebox P3901) ─────────────────┐
|
||
breaker│ Phoenix SPD · fuse holder · DIN rail · SSR/opto (ignition isolation)│
|
||
+ SPD ►│ Mean Well DDR-60G-24 ──► regulated 24 Vdc ───┐ │
|
||
│ │ GX16-5 connector │
|
||
│ ┌────────── HBOX (3D-printed ASA) ─────────┼────┐ │
|
||
│ │ Mean Well SD-15B-05 (18–36V→5V,3A) ──► 5V rail │ │
|
||
│ │ ├► PowerBoost 1000C (+18650 Li-ion 1S4P) backup │
|
||
│ │ ├► STM32F411 Blackpill WATCHDOG ──UART(PA2)──► simpleRTK2B Pro │
|
||
│ │ │ └ switches RTK 5V via 2N3904→IRF9540N (PA1) │
|
||
│ │ ├► simpleRTK2B Pro (ZED-F9P) + 4G NTRIP Master (XBee LTE) │
|
||
│ │ └► ignition 24V ──► DFR1015 buck ──► STM32 PA5 (ign sense) │
|
||
│ └──────────────────────────────────────────────────────────────┘ │
|
||
└───────────────────────────────────────────────────────────────────┘
|
||
4G/LTE ▲ RTCM3 in (NTRIP) │ NMEA out (UDP)
|
||
Base station (Ardusimple AS-PRO-CORS) ────┘ ▼
|
||
retranslator.py ─(anti-jump+speed filter)─► Wialon / Traccar ─► VERONICA
|
||
```
|
||
|
||
- **Power into HBOX = clean 24 V** from the cabinet (via **GX16-5**). Internal
|
||
**Mean Well SD-15B-05** makes 5 V; **PowerBoost 1000C + 18650** is battery
|
||
backup; **DFR1015** conditions ignition to the Blackpill. *(This diagram is the field
|
||
as-built; the **EinarBoard 1.0 carrier supersedes the battery + ignition path** — LTC4040
|
||
battery-backup on-board, **DFR1015 removed entirely** (Rev 1.1): GX16 pin 3 raw ignition →
|
||
22k/10k divider + BAT54 clamp → PA5. See
|
||
`03-Architecture-Hardware/watchdog-electrical-design-state.md` + the 2026-07-06 audit.)*
|
||
- **Corrections arrive over the 4G modem** (RTCM3 via NTRIP), not the GNSS — so a
|
||
GNSS reset can't fix a dead link; recover by power-cycling the stack (v2 does).
|
||
- **Watchdog** = STM32F411; see [[03-Architecture-Hardware/watchdog-schematic|watchdog-schematic]].
|
||
|
||
---
|
||
|
||
## 1b. Canonical invariants (inherits `Helgen Project Ethos`)
|
||
|
||
The rules this system must never violate. Check every design/code output against
|
||
these before presenting; if it breaks one, say so and propose the compliant fix.
|
||
|
||
1. **Power-off is the safe state.** The RTK stack defaults OFF (gate pull-up) until
|
||
the MCU asserts; loss of confidence → safe state, not best-guess.
|
||
2. **Never vanish, never loop.** A unit must keep reporting (standalone if needed)
|
||
rather than go silent, and must never enter an infinite fast-reboot loop.
|
||
3. **Corrections ride the 4G modem, not the GNSS** — recover the link by
|
||
power-cycling the stack; a GNSS reset is never a fix for lost NTRIP.
|
||
4. **No material that softens below ~80 °C (PLA-class) in the thermal path** — the
|
||
current **ASA** enclosure complies. Design to the measured cabinet-interior
|
||
temperature, not spec-sheet ambient.
|
||
5. **Backend reads/forwards without head-of-line blocking**, and the anti-jump
|
||
filter must never permanently lock out a healthy unit.
|
||
6. **No secrets in the repo — ever.** (The committed MSSQL password is a live
|
||
violation to remediate.)
|
||
|
||
## 1c. Hard constraints (non-negotiables)
|
||
|
||
- HBOX input is the cabinet's **regulated 24 V** + isolated ignition; don't
|
||
re-implement the cabinet's surge/breaker/SSR on the HBOX.
|
||
- **IP67 maintained** — cooling by conduction only; no IP-breaking vents/fans.
|
||
- **Bench-test firmware before any field flash** (no STM32 build in the sandbox).
|
||
- Client-facing docs are **Spanish**, routed through Leo.
|
||
- Use the **file tools** for file changes; verify the shell mount before bulk moves.
|
||
|
||
---
|
||
|
||
## 2. Directory (Helgen English `NN-` standard — keep this table current)
|
||
|
||
| Folder | Holds | Key files |
|
||
|---|---|---|
|
||
| `00-Project-Management` | plan, ethos, hackathon, **financials**, **handover**, client comms, Drive tooling | [[00-Project-Management/PLAN\|PLAN]] · [[00-Project-Management/Engineering-Handover\|Engineering-Handover]] · `ethos.md` · `hackathon-plan.md` · `Financials.md` · `Drive-Upload/` · `client-comms/` |
|
||
| `01-Requirements` | what we build | `SRS.md` · `HBOX-product-spec.md` |
|
||
| `02-Architecture-Software` | backend/software analysis, ADRs | `backend-review.md` |
|
||
| `03-Architecture-Hardware` | HBOX/cabinet, wiring, BOM, **watchdog PCB v3** | `hardware-respec-and-pcb-brief.md` · `cabinet-electrical-bom.md` · `watchdog-schematic.md` · `watchdog-health-telemetry.md` · `firmware-review.md` · `BOM-master.md` (+§5 Block B/E/H/I parts) · **`watchdog-pcb-v3-design.md`** (schematic spec) · `watchdog-pcb-v3-bom.xlsx` · `watchdog-pcb-v3-kicad-guide.md` (KiCad→JLCPCB) · `watchdog-pcb-v3-blockdiagram.svg` · `watchdog-protoboard-bringup.md` + `watchdog-proto-bench-bringup-v3.md` · `watchdog-connections.xlsx` (PCB pin/net list; H1 DNP; +B/H/I rows) · `watchdog-connections-rationale.md` (+§7 additions 2026-07-02) · **`watchdog-electrical-design-state.md`** (CANONICAL — read first) · **`watchdog-production-schematic-delta.md`** (PROD build spec; LTC4040 §4 values) · `kicad/` — `hbox-watchdog-v3.kicad_sch` (**DEV/proto**) · `hbox-watchdog-v3-PROD.kicad_sch/.kicad_pcb` (**PRODUCTION**: ERC 0, layout started, DRC baseline) · `Drogheda-sym.kicad_sym` (MP1584EN · LTC4040EUFD · AO4406A) · `Drogheda_Conexiones-por-Bloque_Proto_v1.xlsx` (**proto assumptions ledger**) · `Guia-Conexion-Protoboard/` (LaTeX source; `modulos-pinout.tex` = visual parts catalog) → `Drogheda_Guia-Conexion-Protoboard_ES_v3.1.pdf` · **`2026-07-08_Drogheda_4G-Modem-Alternatives_v1.0.md`** (XBee 2.0 mm bridge + cheap-4G survey) · `circuitikz-wiring/` (sheet + Beamer v2.1, blocks 1–11; XBee-socket 3V3 fix 07-08; **`Drogheda_Diagrama-Unico-Proto`** = todo-en-una-hoja para verificación rápida, Modo B; v1.1 07-10 agrega XBee 20-pin obligatorios VREF(14)→VCC · ON/OFF(20)→GND · GND×4 + USB config + franja de pinouts para el técnico; HiRes-300dpi.png para TV; **v1.2 07-20**: letras G/D/S·B/C/E en todos los transistores + bloque 5b Q10+DzG 15V) · **Guía v3.1** (5b Q10+Zener · 9c pines obligatorios XBee + USB · disipadores · plano 10×10) · **lista de compras reconstruida DESDE CERO** (1 tarjeta ≈MX$2,087) · `watchdog-protoboard-BOM-3boards.xlsx` + `watchdog-LISTA-DE-COMPRAS-ES.xlsx` (proto BOMs; 07-10: +BOB-08276/PRT-08272, buck «MODEM 3.3V», breakout USB-C+cable, botón/LED módem, straps VREF/ON-OFF, surtido +220R/22k) · **`2026-07-06_Drogheda_EinarBoard-1.0-PreFab-Audit_v1.0.md`** (CLOSED — Rev 1.1 fixes) · `Assembly-BOM-Split.md` + `LCSC-search-list.md` (verified LCSC) + `JLCPCB-Order-Guide.md` (ordering runbook) · `harness-connector-pinout.md` + `Socket-Pinout-Silkscreen.md` · **`EinarBoard-Manual/`** (Rev 1.1 order-prep pack: `einarboard-manual.tex` → branded PDF · `helgen_einarboard_1.0_production_bom.xlsx` · `tools/generate_production_bom.py` + `tools/sync_bom.py` Excel→LaTeX BOM sync) — plus repo-root `scripts/prep_order_release.sh` (safe cleanup + release commit) · **`2026-10-16_Drogheda_Auditoria-Produccion_V5.6-V5.7-v6_ES_v1.0.md`** (production audit + comparison table) + `2026-10-16_Drogheda_Instrucciones-Michelle_V5.6-V5.7-Pasada-3_ES.md` · `kicad/tools/t25_mounting_holes_v55.py` (restores the 7 V5.5 holes) · `kicad/tools/t27_paso1_2_mh11_rs1_kelvin.py` (MH11 out + RS1 Kelvin, V5.6/V5.7) · `kicad/tools/t28_v6_mecanicos.py` (v6: U25 part code, stackup, U6 paste) · `kicad/tools/t30_v56_v57_mecanicos.py` (V5.6/V5.7 mechanical fixes, 19-oct) · `kicad/tools/t31_c129_vsys_quitar_dbk2.py` (V5.6/V5.7 schematic: C129 at U6 VSYS + Dbk2 out, 20-oct) · `kicad/tools/t32_c130_vin_u7.py` (V5.6/V5.7 schematic: C130 at U7 VIN, 21-oct) · `kicad/tools/t33_v56_v57_auditoria_21oct.py` (V5.6/V5.7 PCB fixes from the 21-oct audit) · `kicad/tools/t34_v56_pasada6.py` + `t35_v56_via_u7.py` (V5.6 pass 6) · `kicad/tools/t36_v57_pasada6.py` + `t37_v57_c129_gnd.py` (V5.7 pass 6) · `kicad/tools/t38_v6_courtyards_mh.py` (v6: courtyards of the 11 easyeda2kicad footprints + library, MH6 `/3V3` to B.Cu, 4-mm MH rule in the `.kicad_dru`) · `kicad/tools/t39_v6_bloque_a.py` (v6 block A, proposal α: D34/L22/R53/R54 moved, SW + VEH5V tracks, In1/In2 cleared, MH8 free) · `2026-10-16_Drogheda_Auditoria-Produccion_v6_ES_v1.0.md` + `2026-10-16_Drogheda_Plan-Fines-de-Semana_v6-Produccion_ES.md` (v6 audit + weekend plan, rev 1.4) · **`2026-10-19_Drogheda_Re-Auditoria_V5.6-V5.7-v6_ES_v1.0.md`** (re-audit of all three) + `2026-10-19_Drogheda_Instrucciones-Michelle_V5.6-V5.7-Pasada-4_ES.md` · **`2026-10-19_Drogheda_V5.6_Clasificacion-Criticos_ES_v1.0.md`** (V5.6 critical vs. can-stay; C129) · **`2026-10-21_Drogheda_Auditoria-Pasada-4_V5.6-V5.7_ES_v1.0.md`** (audit of pass 4, T32/T33 results, pass-5 review, pass 6 done by Claude with T34–T37 + D-21-2) · **`2026-10-21_Drogheda_Estado-v6-T25-T28_ES_v1.0.md`** (v6 state, rev 1.2 of 22-oct: T25 + T28 + T38 + **T39 block A** applied, MH rule; figure `img/2026-10-22_Drogheda_v6-T39-Bloque-A_v1.0.png`) · **`2026-10-22_Drogheda_Auditoria-Final-Produccion_V5.6-V5.7_ES_v1.0.md`** (FINAL production audit of the V5.6/V5.7 fab packages: GO pilot 5 + 5 with 3 order conditions, NO-GO 108/322 until bench with 0.7.0; 30 findings, 16 risks) + `…_Protocolo_ES_v1.0.md` (the audit protocol / "reprompt") + **`Auditoria-Final-V56-V57/`** (LaTeX sources → 33-pp PDF + 19-frame Beamer; `fig/`; `scripts/` gerb.py · gcmp.py · netparse.py · copper.py · riesgos.py) · `img/2026-10-22_Drogheda_*.png` (8 figures) |
|
||
| `04-Source-Code` | firmware + backend repos | `firmware/` (**own git repo `hbox-firmware`**: `blackpillrtkcode_v2/` deploy · `legacy/` v1 · `docs/LOGGING-SPEC.md` v2.1 · **`hbox_v5_bringup/board_v56.h`** (V5.6/V5.7 pin map, 22-oct; 0.7.0 base)) · `htracker/` · `notifications/` · `rtk-config/` |
|
||
| `05-Analytics-Reports` | SQL views, dashboards (VERONICA/PowerBI), **observability** | `2026-06-22_Drogheda_Manual-Logs-Grafana_v1.0.pdf` (Grafana/Loki log-consultation manual) |
|
||
| `06-Testing-Validation` | RCA, diagnostics, test evidence, **log analysis & tooling** | `RCA-2026-06-field-failures.md` · `remote-diagnostic-protocol.md` · `2026-06-20_Drogheda_Bench-Log-Analysis_v1.0.md` (rev-3) · `2026-06-20_Drogheda_GNSS-Findings-Summary.md` · `log-analysis/` (repo **`hbox-log-tools`**: `log-explorer.html` · `analyze_logs.py` · `build_dashboard.py` · `docs/manual.pdf`) |
|
||
| `Marketing` | product-facing collateral (LaTeX→PDF) | `HBOX-Datasheet/` (industrial spec sheet) · `HBOX-Brochure-RTK/` (flyer) |
|
||
| `99-Archive` | superseded raw inputs (read-only) | `situation_ORIGINAL.md` |
|
||
| `hbox-docs/` | **the command centre** (submodule): internal site drogheda.helgen.online — MkDocs + Flask backend (actas, pendientes, inventario, sitios, equipo, enfoque, actividad) | **`CLAUDE.md`** (where each piece lives) · `docs/datos/proyecto.json` (Ruta, hitos) · `docs/hardware/index.md` · `docs/tableros/ingenieria.md` (decisions) · `docs/bitacora.md` · `scripts/sync-docs.sh` (publication policy) · `scripts/deploy.sh` · **`scripts/tablero.sh` + `backend/tablero.py` + `backend/lotes/`** (board snapshot and Claude's lotes, 21-oct) · `_estado/` (snapshot, gitignored) · `DESPLIEGUE.md` |
|
||
| `.claude/skills/` | vendored project skill | `project-drogheda/` |
|
||
|
||
> Structure follows the **[[Helgen Project Template]]** (English `NN-`). The Google
|
||
> Drive mirror keeps the legacy Spanish `00_…99_` scheme (Drive manual); finalized
|
||
> deliverables export there. Naming: `AAAA-MM-DD_Drogheda_Descripción_vX.X` — no
|
||
> loose files in root except this index. **Empty legacy Spanish dirs remain (the
|
||
> mount can't delete them) — remove locally:** `rmdir 0?_* 99_Archivo docs hardware …`
|
||
|
||
---
|
||
|
||
## 3. HBOX BOM (per unit, 24 V variant — see `03-Architecture-Hardware/BOM-master`)
|
||
|
||
simpleRTK2B **Pro** (AS-RTK2B-PROF9P-L1L2-NH-00) · 4G NTRIP Master
|
||
(AS-XBEE-4G-NA-UFL-00) · Blackpill STM32F411 · U-blox multiband antenna
|
||
(AS-ANT2B-ANN-L1L2-50SMA) + 2× LTE antennas (AR1582) · **Mean Well SD-15B-05**
|
||
(24→5 V) · **PowerBoost 1000C** + **18650 1S4P** · **DFR1015** (ignition) ·
|
||
2N3904 + IRF9540N + 2N7000 watchdog · **GX16-5** HBOX↔cabinet · ASA case/top/
|
||
brackets · Telcel micro-SIM.
|
||
|
||
---
|
||
|
||
## 4. Deployment & people
|
||
|
||
**BUs / terminals:** ICAVE (stress lab, live), TIMSA, EIT, LCT. **ICAVE machine
|
||
voltages:** RTG 24 V, Reach Stacker 24 V, Empty Handler 24 V, Tractoplana 12 V,
|
||
Montacargas 12 V. **Target:** 30 units by August.
|
||
|
||
| Name | Email | Role |
|
||
|---|---|---|
|
||
| Leo Rodriguez | leo@helgen.tech / ceo@helgen.tech | Helgen — founder/CEO |
|
||
| Adriana Del Angel | adriana@helgen.tech | Helgen — implementation/plan |
|
||
| Paola Rodriguez | paola@helgen.tech | Helgen |
|
||
| Angel Daniel Martinez | daniel@helgen.tech | Helgen |
|
||
| Gibran Ortega | gibran@helgen.tech | Helgen — GPS/telemetry |
|
||
| **Agustín Alfonseca** | alfonseca.agustin@icave.com.mx | **Client** — ICAVE Tech Research Supervisor |
|
||
| Leon David Piña | pina.david@hutchisonports.com.mx | Hutchison Ports |
|
||
|
||
---
|
||
|
||
## 5. Where things live (off this workspace)
|
||
|
||
- **Google Drive (team source of truth):** `Drogheda (GPS RTK)` — official
|
||
numbered structure 00–99 + manual `LEEME_Drogheda_Estructura_y_Uso`. Mirror this
|
||
workspace's structure to it for finalized deliverables.
|
||
- **Second Brain vault** (`~/Documents/Second Brain/03 Projects/Helgen/`): only
|
||
polished, evergreen notes (decisions, lessons, contacts) — see
|
||
`Project-Drogheda/` once synced.
|
||
- **Backend repo:** `ssh://git.helgen.dev:6611/htracker` (retranslator + monitor),
|
||
cloned at `04-Source-Code/htracker` (branch `feature/test500unidades`).
|
||
- **Observability (logs):** backend logs ship off-box to **Grafana Loki** (free tier, 50 GB/mo,
|
||
14-day) via **Vector** (default) or **Grafana Alloy** reading journald (capped 200 MB) —
|
||
`04-Source-Code/htracker/log-shipping/` (`README.md` runbook · `setup-logging.sh` · `vector.toml`).
|
||
Read in Grafana → Explore → Loki: `{job="htracker"}` (Vector) or `{unit="htracker.service"}`
|
||
(Alloy). Consultation manual (PDF): `05-Analytics-Reports/2026-06-22_Drogheda_Manual-Logs-Grafana_v1.0.pdf`.
|
||
Creds in `/etc/vector/htracker.env` (server) — never in the repo.
|
||
- **Firmware repo:** `ssh://git.helgen.dev:6611/hbox-firmware` (STM32F411 watchdog),
|
||
lives at `04-Source-Code/firmware` (branch `main`) — its own git repo with README,
|
||
`docs/PINOUT.md`, redacted RTK-config template, CHANGELOG. Push instructions in its README.
|
||
**v2.1 logging spec** at `docs/LOGGING-SPEC.md` (structured/parseable Blackpill log; not yet flashed).
|
||
- **Log-tools repo:** `ssh://git.helgen.dev:6611/hbox-log-tools` (HBOX log analysis —
|
||
in-browser **Log Explorer** + batch **analyzer** + dashboard + Spanish LaTeX **manual**),
|
||
lives at `06-Testing-Validation/log-analysis/`. Raw logs + config files git-ignored
|
||
(credentials). Built 2026-06-20.
|
||
- **Project tracker:** **drogheda.helgen.online → Pendientes** (since 13/14-oct; the Notion task tracker and the
|
||
`HBOX Unit Status — Bench Triage` board are historical, imported once) + Mattermost (team chat). Claude changes the
|
||
board only through lotes (★ above).
|
||
|
||
---
|
||
|
||
## 6. Hard facts — don't relearn these
|
||
|
||
- NMEA GGA quality ≥4 = healthy (4 = RTK-fixed, 5 = RTK-float).
|
||
- ZED-F9P rated −40…+85 °C — heat casualties are the **18650/PowerBoost** and the
|
||
**4G modem**, not the GNSS or the case.
|
||
- **The case is ASA** (UV-stable, softens ~95–100 °C) — adequate for the nested ABS
|
||
IP67 cabinet interior; the enclosure is **not** the liability. **A bare fan inside a
|
||
sealed box does not cool it** — conduct heat out, or use a ducted fan (v3.0). See hardware brief §2b.
|
||
- Corrections come over 4G → recover by power-cycling the stack (v2), not a GNSS
|
||
reset. Backend can take healthy units off Wialon (HOL block + anti-jump lockout).
|
||
- HBOX input = **24 V** from the cabinet; design the redesign around that.
|
||
- Firmware: edit `04-Source-Code/firmware/blackpillrtkcode_v2/blackpillrtkcode_v2.ino`
|
||
(own git repo `hbox-firmware`); **bench-test before field flash** (sandbox can't build STM32).
|
||
- **20 Jun logs — receivers are fine; RTK is not being achieved.** Every board emits valid
|
||
NMEA (good sats/HDOP) but **every epoch is SPS (1), zero RTK (4/5)**. Corrections aren't
|
||
applied: **free public rtk2go caster** (no SLA), F9P config dumped from **RAM only** (verify
|
||
saved to FLASH; check the Pro's XBEE↔UART2 switch), plus indoor sky. F9P message config is
|
||
correct (GGA on UART2 @1 Hz).
|
||
- **The 4G-NTRIP-Master console does NOT prove forwarding** — a healthy unit logs the same
|
||
sparse console ("registered", no `State main`/`UDP Bytes sent`) as a failed-looking one.
|
||
Confirm health only from a `.ubx` (fix), the Blackpill, or a server delivery capture.
|
||
→ **"master-14 ingest fault" RETRACTED**; only **master 21** (modem `0xFFFFF` + 511 AT errors)
|
||
is a confirmed fault.
|
||
- **Healthy GNSS baseline = `RTK14NTRIP14_440`** (server-verified 1 Hz delivery, 12 sats,
|
||
HDOP 0.75, **but SPS not RTK**). Raise the bar to an open-sky fix-≥4 capture.
|
||
- **Heat is NOT implicated** by the bench logs (faults reproduce cold; v1 has no thermal
|
||
channel). Field thermal hypothesis still needs a thermocouple cabinet soak.
|
||
- **`dashboard.html` predates the rev-3 retraction** (still marks the no-forward captures
|
||
"Failed"); the canonical corrected record is the GNSS summary + the rev-3 findings doc.
|
||
|
||
## 7. Working notes
|
||
- Use the **file tools** (Read/Write/Edit) for file changes; the shell mount can
|
||
go stale — verify before bulk shell moves. Six empty legacy dirs (`docs`,
|
||
`firmware`, …) remain from the restructure; delete them manually.
|
||
- Client-facing docs are **Spanish** and route through Leo.
|
||
|
||
<!-- OBJECTIVITY:START — managed by _framework/scripts/apply-objectivity.sh; edit there + re-run -->
|
||
## Objectivity — partner, not sycophant
|
||
|
||
I want an objective partner, not a sycophant. On every task:
|
||
|
||
- **Genuine take first.** Lead with your real assessment. Don't mirror my tone or sentiment, and don't open by validating me.
|
||
- **Disagree when you disagree.** Say so plainly and explain why — and pair the criticism with a concrete better option (direct *and* constructive).
|
||
- **Self-check.** If a reply is about to start with something semantically like "You're right" / "Good point" / "Great question," stop and first answer: *"Is this true?"*
|
||
<!-- OBJECTIVITY:END -->
|