Drogheda/03-Architecture-Hardware
Leopoldo Rodríguez 9512aa48cb C12: clear all 3 KiCad 10 DRC errors + dangling-via warning (EinarBoard 2.0)
E1  clearance 0.1433 < 0.15  (/LED_A via vs /I2C_SCL via, 4 raw reports)
    Relocated the /LED_A via 202c8cb4 from (147.15,85.85) to (147.25,86.22),
    dead centre of the U13.1/U13.2 gap. uuid preserved; both attached segment
    endpoints carried (In1.Cu 375e8fa7, B.Cu dee4fa4e). Worst gap now +0.2405.

E2  unconnected_items x2 + starved_thermal x1 -- ONE root cause.
    The F.Cu GND pour pocket around U11 pad 29 was an island: it touched the
    pad with a single thermal spoke but was fenced in by the LQFP-48 lead ring
    and the escape routing, so it reached nothing else. Gave pad 29 a real
    copper escape west to a new GND via that punches through to the In2 GND
    plane, and set the pad to solid zone connection so the 2-spoke thermal
    rule stops applying to a pad the pour can only reach from one side.
      seg F.Cu w0.3 GND (99.4525,55.26)->(98.65,55.26)   margin +0.2000
      seg F.Cu w0.3 GND (98.65,55.26)->(97.55,54.45)     margin +0.2000
      via 0.6/0.3 F.Cu-B.Cu GND @(97.55,54.45)           copper +0.2718
      U11 pad 29 -> (zone_connect 2)
    +0.2000 is the structural ceiling for a 0.5mm-pitch lead escape with a
    0.3 track, and matches the neighbouring /3V3_ETH and /ETH_XI escapes.

E3  via_dangling  /3V3_ETH via 3b0bb378 @(87.18,55.23) connected on F.Cu only.
    Deleted. Touch test: 4 touching F.Cu segments, zero on In1/In2/B.Cu. The
    F.Cu run at x=87.18 is collinear and continuous without it.

Verified: static DRC 0 hard violations (49 pre-existing marginals inside
KiCad's 0.0005 epsilon, unchanged). Per-net islands unchanged at 1 for
/LED_A /3V3_ETH /I2C_SCL /ETH_XI /ETH_RSET. New via lands inside
GND_PLANE_IN2 + GND_POUR_BCU, outside MAGJACK_NO_POUR. U11 is a plain
LQFP-48 with no exposed pad, so the under-body via is clear. Leo's 24V-class
copper (24V /24V_IN IGN_IN, 45 segments) byte-identical.

Backup: .mcp-backups/hbox-watchdog-v4.kicad_pcb.pre-C12 (md5 7c2202cb)
New:    md5 042efd5dd0cf99fdcfd27974b7bcb3c1  3502425 bytes

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01GSKKes8GsS4YHAMWJ44tCm
2026-08-01 01:09:55 +00:00
..
CAD-Files auto-sync 2026-07-13 18:00 2026-07-13 18:00:15 -06:00
circuitikz-wiring auto-sync 2026-07-20 18:00 2026-07-20 18:00:14 -06:00
EinarBoard-Manual sync: commit before registering as submodule 2026-07-08 14:58:40 -06:00
Guia-Conexion-Protoboard auto-sync 2026-07-20 18:00 2026-07-20 18:00:14 -06:00
kicad C12: clear all 3 KiCad 10 DRC errors + dangling-via warning (EinarBoard 2.0) 2026-08-01 01:09:55 +00:00
Manual-Instalacion-Operacion Initial commit (Hub backfill) 2026-06-21 23:39:49 -06:00
4G-USB-Reset-LED-addition.md auto-sync 2026-07-06 18:00 2026-07-06 18:00:09 -06:00
0007-1000_Assembly_Guide.pdf auto-sync 2026-07-11 18:00 2026-07-11 18:00:15 -06:00
2026-07-06_Drogheda_EinarBoard-1.0-PreFab-Audit_v1.0.md sync: commit before registering as submodule 2026-07-08 14:58:40 -06:00
2026-07-08_Drogheda_4G-Modem-Alternatives_v1.0.md auto-sync 2026-07-09 18:00 2026-07-09 18:00:14 -06:00
2026-07-24_Drogheda_EinarBoard-1.1_Design-Brief_v1.0.md EinarBoard 1.1 design brief: locked decisions (RS-485+RS-232 via SC16IS752, on-board W5500 Ethernet, RGB status LED, board growth) + execution phases 2026-07-29 01:58:39 +00:00
Assembly-BOM-Split.md auto-sync 2026-07-05 18:00 2026-07-05 18:00:08 -06:00
BOM-master.md 2026-07-02: PROD schematic complete (ERC 0) + carrier-board PCB + doc sweep to the Jul-2 ledger 2026-07-02 22:18:56 -06:00
bom.xls sync: commit before registering as submodule 2026-07-08 14:58:40 -06:00
cabinet-electrical-bom.md Initial commit (Hub backfill) 2026-06-21 23:39:49 -06:00
Drogheda_Conexiones-por-Bloque_Proto_v1.xlsx auto-sync 2026-07-03 18:00 2026-07-03 18:00:09 -06:00
Drogheda_Diagrama-Cableado-Proto_ES.pdf 2026-07-02: PROD schematic complete (ERC 0) + carrier-board PCB + doc sweep to the Jul-2 ledger 2026-07-02 22:18:56 -06:00
Drogheda_Diagrama-Cableado-Proto_ES.png 2026-07-02: PROD schematic complete (ERC 0) + carrier-board PCB + doc sweep to the Jul-2 ledger 2026-07-02 22:18:56 -06:00
Drogheda_Diagrama-Cableado-Proto_ES.svg 2026-07-02: PROD schematic complete (ERC 0) + carrier-board PCB + doc sweep to the Jul-2 ledger 2026-07-02 22:18:56 -06:00
Drogheda_EinarBoard-1.0_Tabla-Conexiones-Externas_v1.0.pdf auto-sync 2026-07-23 18:00 2026-07-23 18:00:14 -06:00
Drogheda_Guia-Cableado-Proto-Watchdog-v3_ES.pdf 2026-07-02: PROD schematic complete (ERC 0) + carrier-board PCB + doc sweep to the Jul-2 ledger 2026-07-02 22:18:56 -06:00
Drogheda_Guia-Conexion-Protoboard_ES_v2.2.pdf auto-sync 2026-07-03 18:00 2026-07-03 18:00:09 -06:00
Drogheda_Guia-Conexion-Protoboard_ES_v3.0.pdf auto-sync 2026-07-09 18:00 2026-07-09 18:00:14 -06:00
Drogheda_Guia-Conexion-Protoboard_ES_v3.1.pdf auto-sync 2026-07-20 18:00 2026-07-20 18:00:14 -06:00
Drogheda-BOM-Maestro.xlsx Initial commit (Hub backfill) 2026-06-21 23:39:49 -06:00
Drogheda-Manual-Instalacion-Operacion.pdf Initial commit (Hub backfill) 2026-06-21 23:39:49 -06:00
EinarBoard-1.0-BOM-JLC-PCBA-JLCPCB Assembly Order.xls sync: commit before registering as submodule 2026-07-08 14:58:40 -06:00
EinarBoard-1.0-BOM-JLC-PCBA-v3-pinned-JLCPCB Assembly Order.xls sync: commit before registering as submodule 2026-07-08 14:58:40 -06:00
firmware-review-v2.3-EinarBoard.md Firmware review: v2.3 as EinarBoard 1.0 production candidate (2026-07-24) 2026-07-24 01:27:20 +00:00
firmware-review.md Initial commit (Hub backfill) 2026-06-21 23:39:49 -06:00
hardware-respec-and-pcb-brief.md Initial commit (Hub backfill) 2026-06-21 23:39:49 -06:00
harness-connector-pinout.md auto-sync 2026-07-04 18:00 2026-07-04 18:00:09 -06:00
JLCPCB-Order-Guide.md auto-sync 2026-07-06 18:00 2026-07-06 18:00:09 -06:00
LCSC-search-list.md auto-sync 2026-07-07 18:00 2026-07-07 18:00:12 -06:00
Socket-Pinout-Silkscreen.md auto-sync 2026-07-05 18:00 2026-07-05 18:00:08 -06:00
watchdog-connections-rationale.md auto-sync 2026-07-03 18:00 2026-07-03 18:00:09 -06:00
watchdog-connections.xlsx 2026-07-02: PROD schematic complete (ERC 0) + carrier-board PCB + doc sweep to the Jul-2 ledger 2026-07-02 22:18:56 -06:00
watchdog-electrical-design-state.md auto-sync 2026-07-09 18:00 2026-07-09 18:00:14 -06:00
watchdog-health-telemetry.md add objectivity rule across all projects 2026-06-24 00:44:04 -06:00
watchdog-LISTA-DE-COMPRAS-ES.xlsx auto-sync 2026-07-20 18:00 2026-07-20 18:00:14 -06:00
watchdog-pcb-v3-blockdiagram.svg auto-sync 2026-06-22 18:00 2026-06-22 18:00:16 -06:00
watchdog-pcb-v3-bom.xlsx add objectivity rule across all projects 2026-06-24 00:44:04 -06:00
watchdog-pcb-v3-design.md 2026-07-02: PROD schematic complete (ERC 0) + carrier-board PCB + doc sweep to the Jul-2 ledger 2026-07-02 22:18:56 -06:00
watchdog-pcb-v3-kicad-guide.md auto-sync 2026-06-22 18:00 2026-06-22 18:00:16 -06:00
watchdog-pcb-v3-routing-status.md auto-sync 2026-07-04 18:00 2026-07-04 18:00:09 -06:00
watchdog-production-schematic-delta.md 2026-07-02: PROD schematic complete (ERC 0) + carrier-board PCB + doc sweep to the Jul-2 ledger 2026-07-02 22:18:56 -06:00
watchdog-proto-bench-bringup-v3.md auto-sync 2026-07-03 18:00 2026-07-03 18:00:09 -06:00
watchdog-protoboard-BOM-3boards.xlsx auto-sync 2026-07-20 18:00 2026-07-20 18:00:14 -06:00
watchdog-protoboard-bringup.md auto-sync 2026-07-03 18:00 2026-07-03 18:00:09 -06:00
watchdog-schematic.md Initial commit (Hub backfill) 2026-06-21 23:39:49 -06:00