Drogheda/03-Architecture-Hardware/kicad
Leopoldo Rodríguez b505cb35c2 v4 production package for JLCPCB: gerbers, BOM, CPL + audit
Fabrication Toolkit export of hbox-watchdog-v4 (EinarBoard 2.0), verified
before ordering. Board is 155.00 x 100.00 mm, 4 layers, 1.6 mm.

New in production/:
  HBOX_v4_PROD.zip             15 gerber + drill files
  HBOX_v4_PROD_bom.csv         102 lines, 25 with an LCSC number
  HBOX_v4_PROD_positions.csv   187 rows
  HBOX_v4_PROD_designators.csv toolkit by-product, not a JLC input

hbox-watchdog-v4.kicad_pcb is modified only because the toolkit's AUTO FILL
refilled zones and re-saved on export. Diffed before/after: 0 footprints
moved, 0 rotated, 0 changed side; tracks 1989 -> 1989, vias 351 -> 351,
zones 5 -> 5, filled polygons 41 -> 41. Zone fill data only.

Verification (details in the order walkthrough):
  - Row counts matched a prediction registered before the export existed:
    CPL 187, BOM 102, 35 machine-placed. No duplicate designators, no
    collisions from the toolkit's uppercasing of refdes, nothing truncated.
  - All 30 pre-registered rotation predictions matched exactly, 0 mismatches.
    The five previously-unproven packages resolved as J10 +0 deg and
    U10/U11/U13/U15 +270 deg.
  - Every non-zero rotation correction is externally backed: six packages
    (SOT-23, SOIC-8, SOIC-8-1EP, QFN-24-1EP, CP_Elec_6.3x7.7, Arduino_UNO_R3)
    are byte-identical to the v3 CPL that JLC built; the other four (LQFP-48,
    SOIC-16, SOIC-16W, TSSOP-28) match KiBot's published JLCPCB rotation
    table. KiBot's generic ^QFN- rule says 270 where the toolkit applied +90
    to U6 - v3 hardware settles it in the toolkit's favour.
  - Positions: 22 rows carry an AUTO TRANSLATE offset. 19 of 22 identical to
    the v3 export, 20 of 22 equal the pad bounding-box centroid to 0.02 mm.
    J10 is the only machine-placed part with a translation and it matches the
    centroid exactly.
  - Gerbers: 4 copper layers populated, both mask, both silk, F.Paste 40
    apertures. B_Paste empty is correct (the one bottom-side part has no
    paste). 523 PTH holes 0.30-1.63 mm, 6 NPTH at 3.20/3.25 mm.

Open before ordering: J10 (C12074 HR911105A) is the only through-hole part
carrying an LCSC number, so JLC's standard SMT line will not place it.
Also gitignore **/_to_delete/ (scratch folder for manual deletion).

Co-Authored-By: Claude <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01GSKKes8GsS4YHAMWJ44tCm
2026-08-01 06:57:17 +00:00
..
_archive-2026-07-07 sync: commit before registering as submodule 2026-07-08 14:58:40 -06:00
Drogheda.pretty 1.1 Phase A: schematic blocks M/N/O (SC16IS752+RS485+RS232, W5500+MagJack+3V3_ETH buck, PCF8574+RGB), gauge->expander frees SPI2, depop P3/P13/H3 2026-07-29 02:17:05 +00:00
logs auto-sync 2026-07-25 18:00 2026-07-25 18:00:14 -06:00
production v4 production package for JLCPCB: gerbers, BOM, CPL + audit 2026-08-01 06:57:17 +00:00
Drogheda-sym.kicad_sym 2026-07-02: PROD schematic complete (ERC 0) + carrier-board PCB + doc sweep to the Jul-2 ledger 2026-07-02 22:18:56 -06:00
fabrication-toolkit-options.json v4 production package for JLCPCB: gerbers, BOM, CPL + audit 2026-08-01 06:57:17 +00:00
fp-lib-table 1.1 Phase A: schematic blocks M/N/O (SC16IS752+RS485+RS232, W5500+MagJack+3V3_ETH buck, PCF8574+RGB), gauge->expander frees SPI2, depop P3/P13/H3 2026-07-29 02:17:05 +00:00
HBOX-v3-PROD.step auto-sync 2026-07-07 18:00 2026-07-07 18:00:12 -06:00
HBOX-v3.2-PROD.step auto-sync 2026-07-30 18:00 2026-07-30 18:00:16 -06:00
HBOX-v3.2-PROD.stl auto-sync 2026-07-30 18:00 2026-07-30 18:00:16 -06:00
hbox-watchdog-v3-PROD.kicad_dru auto-sync 2026-07-06 18:00 2026-07-06 18:00:09 -06:00
hbox-watchdog-v3-PROD.kicad_pcb HBOX v4: project renamed hbox-watchdog-v4 (199 sch + 113 pcb refs); v3-PROD files restored to as-fabricated as the frozen EinarBoard 1.0 record; ERC endpoint_off_grid muted on v4 2026-07-29 03:34:46 +00:00
hbox-watchdog-v3-PROD.kicad_pro HBOX v4: project renamed hbox-watchdog-v4 (199 sch + 113 pcb refs); v3-PROD files restored to as-fabricated as the frozen EinarBoard 1.0 record; ERC endpoint_off_grid muted on v4 2026-07-29 03:34:46 +00:00
hbox-watchdog-v3-PROD.kicad_sch HBOX v4: project renamed hbox-watchdog-v4 (199 sch + 113 pcb refs); v3-PROD files restored to as-fabricated as the frozen EinarBoard 1.0 record; ERC endpoint_off_grid muted on v4 2026-07-29 03:34:46 +00:00
hbox-watchdog-v3.kicad_pcb add objectivity rule across all projects 2026-06-24 00:44:04 -06:00
hbox-watchdog-v3.kicad_prl add objectivity rule across all projects 2026-06-24 00:44:04 -06:00
hbox-watchdog-v3.kicad_pro auto-sync 2026-06-24 18:00 2026-06-24 18:00:06 -06:00
hbox-watchdog-v3.kicad_sch auto-sync 2026-07-06 18:00 2026-07-06 18:00:09 -06:00
hbox-watchdog-v4-c6.dsn auto-sync 2026-07-30 18:00 2026-07-30 18:00:16 -06:00
hbox-watchdog-v4-PROD.dsn 1.1 Phase C7: Freerouting session imported file-level (1773 seg / 232 via, 135 nets) 2026-07-30 07:29:29 +00:00
hbox-watchdog-v4-PROD.rules 1.1 Phase C7: Freerouting session imported file-level (1773 seg / 232 via, 135 nets) 2026-07-30 07:29:29 +00:00
hbox-watchdog-v4-PROD.ses 1.1 Phase C7: Freerouting session imported file-level (1773 seg / 232 via, 135 nets) 2026-07-30 07:29:29 +00:00
hbox-watchdog-v4.kicad_dru C14: netclass-scoped HV24 rule at 0.5 mm + copper fixes to satisfy it 2026-08-01 05:45:07 +00:00
hbox-watchdog-v4.kicad_pcb v4 production package for JLCPCB: gerbers, BOM, CPL + audit 2026-08-01 06:57:17 +00:00
hbox-watchdog-v4.kicad_pro 1.1 Phase C7: Freerouting session imported file-level (1773 seg / 232 via, 135 nets) 2026-07-30 07:29:29 +00:00
hbox-watchdog-v4.kicad_sch 1.1 Phase C10: production footprint corrections + LCSC + silk rev (PRE-FAB GATE) 2026-07-30 23:21:58 +00:00
sym-lib-table 2026-07-02: PROD schematic complete (ERC 0) + carrier-board PCB + doc sweep to the Jul-2 ledger 2026-07-02 22:18:56 -06:00
v4-drc.rpt housekeeping: untrack KiCad ~*.lck session locks, archive v4-drc.rpt 2026-08-01 01:10:32 +00:00