Drogheda/03-Architecture-Hardware/BOM-master.md

5.6 KiB
Raw Blame History

tags project author date status
project-drogheda
bom
sourcing
hardware
Project Drogheda Helgen CTO 2026-06-20 Active

BOM Maestro — HBOX + Gabinete (24 V)

Updated master BOM for the 24 V Drogheda unit (the dominant ICAVE variant). Costs in MXN, from Selección de componentes para gabinete2.xlsx and the H-BOX BOM sheet. This supersedes the older loose BOM. For 12/48/110/230 V variants only the cabinet power/protection parts change (see source sheet).

Why this exists: the earlier BOM drifted from reality. This pins the as-built parts (so diagnosis/PCB work targets the right hardware) and flags the change-list for the production fix.

1. HBOX — internal unit (per unit, 24 V)

# Item Marca / Modelo Qty MXN Notes
1 H-BOX Case Helgen Series1 (ASA print) 1 100 UV-stable, ~95–100 °C — adequate
2 H-BOX Top Helgen Series1 (ASA) 1 50
3 DC PSU bracket Helgen Series1 (ASA) 1 20
4 Battery Case Helgen Series1 (ASA) 1 30 houses 18650
5 SIM Telcel micro 1 100 per-unit data plan
6 GNSS RTK Ardusimple simpleRTK2B Pro (AS-RTK2B-PROF9P-L1L2-NH-00) 1 3,340 ZED-F9P
7 4G/NTRIP Ardusimple 4G NTRIP Master (AS-XBEE-4G-NA-UFL-00) 1 2,440 XBee LTE
8 MCU watchdog DFRobot STM32F411 Blackpill 1 104 runs blackpillrtkcode_v2
9 GNSS antenna Ardusimple AS-ANT2B-ANN-L1L2-50SMA 1 700 multiband
10 LTE antenna Unit Electronics AR1582 (SMA→IPEX) 2 42 4G diversity
11 Headers F 6/8/10-pin 2.54 mm 1ea 10 board interconnect
12 5 V supply Mean Well SD-15B-05 (18–36 V→5 V, 3 A) 1 300 ✅ industrial — keep
13 Boost / charger Adafruit PowerBoost 1000C (2465) 1 400 battery path — review
14 Ignition cond. DFRobot DFR1015 buck 1 106 24 V ign → Blackpill PA5
15 Battery Hyvel 18650 1S4P (FG-0889, 3.6 V) 1 204 ⚠ charge ≤45 °C — decide
16 Status LED + holder Steren 5 mm + bezel 1 3 PB0 path
17 Resistor 1.5 kΩ (use TBC — see watchdog-schematic) 1 1 verify value
18 HBOX↔cabinet GX16-5 macho/hembra 1 22 ✅ locking — keep
19 Watchdog discretes 2N3904, IRF9540N, 2N7000, R (1k/10k/220Ω) — — → consolidate on PCB
20 Dupont terminals red + black 2 4 ⚠ vibration — eliminate
21 Wire, glands, screws, label, switch genérico / Steren — ~110 NPT 3/8 gland
HBOX subtotal ≈ 8,041

2. Gabinete — cabinet (per unit, 24 V)

Item Marca / Modelo Qty MXN
Enclosure IP67 (ABS) Yetlebox P3901 (39×29×16) 1 1,435
DIN rail Weidmüller TS 35×7.5 1 50
Neutral terminals Weidmüller WDU 2.5 5 58
Ground terminals Weidmüller WPE4 4 154
Fuse-holder terminal Phoenix PT 6-FSI/C (3212166) 3 900
End stops Wago 249-116 4 56
Ignition SSR Weidmüller TOS 24VDC 2A 1 684
Surge (SPD) Phoenix TTC-6-TVSD-C-24DC-PT-I 2 1,076
Breaker Phoenix TMC 81C 05A 1 484
Supply → 24 V Mean Well DDR-60G-24 1 748
Fuse (blade) automotriz 2 A 3 6
Cable / ferrules / glands / labels Indiana / Weidmüller / Helgen — ~110
Shipping to port — 1 600
Cabinet subtotal ≈ 6,365

≈ Total per 24 V unit: ~14,400 MXN (HBOX ~8,041 + cabinet ~6,365). An alternate supplier ("Israel" column in the sheet) shows ~1,284 MXN/cabinet savings at 24 V — sourcing decision lives here in 09_.

3. ✅ What's already good (don't re-buy / don't duplicate)

  • Cabinet is industrial-grade: SPD + breaker + isolated SSR ignition + Mean Well 24 V. The HBOX needn't re-implement input surge/protection.
  • SD-15B-05 (24→5 V, 3 A) is a real industrial supply — keep.
  • GX16-5 locking HBOX↔cabinet connector — keep (good vibration practice).

4. ⚠ Change-list for the production fix (feeds the PCB + hackathon)

Change From → To Why Ref
Inner case ASA — keep (adequate); optional metal / plate-mount conduction, not material, is the lever RCA, hardware-brief §2b
Internal wiring Dupont/hand-wire → PCB + locking connectors vibration intermittents hardware-brief §4
Battery path PowerBoost 1000C + 18650 → decide: drop / LiFePO4 / supercap heat + safety; do we need parked tracking? hardware-brief §6.1
Fuse verify the 2 A blade vs measured worst-case + inrush client's "under-rated fuse" RCA H5
Watchdog discretes 2N3904/IRF9540N/pull-ups → integrated load switch on PCB fewer parts, defined turn-on hardware-brief §4
SIM micro-SIM buried → front-panel SIM or MFF2 eSIM maintainability hardware-brief §6.2
Thermal conduct heat to metal plate / sunshade; NO internal fan sealed-box physics hardware-brief §2b

Open Questions

  • Confirm the installed blade-fuse value (2 A may be under-rated for LTE inrush).
  • Battery decision (drop vs LiFePO4 vs supercap) — blocks the PCB power section.
  • Lock supplier per line (Helgen vs alternate quote) for the August batch.