hbox-docs: modo crisis

This commit is contained in:
Leopoldo Rodríguez 2026-10-22 13:59:32 -06:00
parent c62ebcfbe5
commit 57f2fa45b2
2 changed files with 18 additions and 2 deletions

View File

@ -354,7 +354,12 @@ primitive/XOR comparison, `netparse.py`, `copper.py` connectivity + Kelvin + cut
`#elif defined(HBOX_BOARD_V56)` include in the .ino) · lote `2026-10-22_auditoria-final` (closes `t-v56-revision-gerber`, re-aims
`t-v56-piloto` at today's 5 + 5 order with the checklist, `t-fw-070` in progress with F-1..F-8 sized, creates `t-p1-relleno-commit`,
`d-22-1-go-piloto`, `t-preorden-108-322-bom`). 0.7.0 work list: F-1 0.7.0-pre 1 day · F-2 backup cycle 3–4 days · F-3 SC16IS752 1 day ·
F-4 field Ethernet 2 days · F-5..F-8 2 days.
F-4 field Ethernet 2 days · F-5..F-8 2 days. **13:30 re-verification on Leo's 13:00 saves** (V5.6 `338ee14b`, V5.7 `85baca51`, packages
regenerated): saved fill = fresh project-aware refill (0.000 mm² both), package = file, copper and all 11 layers + drills identical to the
morning audit, BOM/CPL same SHA (D10 still SMBJ33A → condition 3 stays), DRC unchanged → **P-1 closed, verdict unchanged**, commit pending.
Only non-fill diff in the files = silkscreen text `render_cache` (cosmetic). Re-check tooling kept in `Auditoria-Final-V56-V57/scripts/`:
`verify_mac.sh` (kicad-cli DRC + as-saved Gerber + project-aware `refill.py` + Gerber) and `gcmp_b.py` (A saved-vs-fresh · B package-vs-file ·
C/D vs the audited copper) — 5 min after any change, before paying; the quick wins run in a parallel session.
**22-oct: T39 — v6 block A done by script (Leo, 09:40: "do the changes on V6, it's the priority").** `kicad/tools/t39_v6_bloque_a.py`
(requires T38; drift-checks every part/track it touches; idempotent; `.T39bak`). Proposal α applied: D34 rot 90 at (181.08, 121.75),
@ -394,6 +399,17 @@ R53/R54 ≤ 3 mm from U6.18» (Michelle, 24-oct); comments on the v6 tasks. Test
backend incl. a simulated 16-oct board. Site: Ruta/hitos/enfoque_inicial to pass 6 (V5.6 and V5.7 «Lista para
Gerber», pilot ≈ 22-oct), Ingeniería decisions + Bitácora entries, «El sitio es el centro de mando» in the
engineer's guide (v1.2), first rule on the home page. Vault: playbook + Drogheda memory set brought to 21-oct.
**Crisis mode (2026-10-22, 13:30; Leo).** Project traffic light **red**. Causes: no payment received this month →
operating tight, no significant purchases; TIMSA (Manzanillo) blocked by an administrative issue with our vehicle there;
EIT (Ensenada) waiting for material shipped from Manzanillo; ICAVE (Veracruz) bad weather → short field windows, with
faults that can only be investigated on site; software: a Wialon retranslator pointing to our server is missing (to
compare RTK vs the legacy GPS in our monitor) and sudden disconnections must be investigated immediately. Immediate goal:
**1–2 units installed per site**. Paying suppliers unblocks most tasks. Board: lote `2026-10-22_crisis` (cobranza,
priority purchase list, purchases/pre-orders/ferretería blocked on payment, per-site install tasks, TIMSA vehicle, EIT
material, ICAVE field investigation, Wialon retranslator, disconnections, field owner per site, periodic meetings).
Site: tasks get `sitios` (icave · timsa · eit · lzc · qro; unset = Querétaro) with a site filter, new track
**Gestión**, a home traffic light with per-site colors, and a **Juntas** page (standup + quick wins recorded with
Gemini → Claude writes a lote → Leo applies). Deploy needs `restart actas-hbox` **before** `tablero.sh aplicar`.
---

@ -1 +1 @@
Subproject commit 8a58719901b642092dafd769e095b8edfc207cf0
Subproject commit 0e828510a95d64e4aa81d372607c3fdbecd27ac4